Nagesh - Highway Engineer - Delhi, India

Mamilla Nagesh

Delhi, India

Services

Highway Engineer

  • Full time
  • Part time
  • One time
  • Contract
  • Temp

Work History

Highway Design Engineer

National Highways Authority of India

Rehabilitation & Upgradation of NH-67(Km 120/900 to Km 218/000 except Lallepatti Bypass) Tiruchirapalli-Karur Section.
CLIENT: National Highways Authority of India
DESIGNATION: Highway Design Engineer.
RESPONSIBILITIES:
In this project I did the Modifications in Cross Section & Preparation of Schedule, Incorporation of Truck Lay Byes, Bus Bays and Toll plaza, Providing Median Openings, Traffic Signs, Design of High Embankment and Design of Plan and Profile for the Drainage.
Software used: MXROAD Windows Profession
PROJECT (15): Detailed Feasibility Study for the Road-Hanumangarh-Sangaria-Dabwali Section(km 0.000 to km 23.000).
CLIENT: RIDCOR
DESIGNATION: Highway Design Engineer.
RESPONSIBILITIES:
In this project I did the Checking and Analysis of Topo Survey Drawing and Data, Generation of Digital Terrain Modeling of Existing Ground, Design of Horizontal Alignment and Production of Plan and Profile Drawings.
Software used: MXROAD Windows Profession
PROJECT (16): DPR of Various Roads in Jhajjar District (Jhajjar-Dadri (km 73/100 to km 95/150) District Boundary and Jhajjar-Kosli (km 28/200 to km 53/000)
CLIENT: HSRDC
DESIGNATION: Highway Design Engineer.
RESPONSIBILITIES:
In this project I did the Conducting Traffic Surveys and Road Inventory, Checking and Analysis of Topo Survey Drawing and Data, Generation of Digital Terrain Modeling of Existing Ground, Design of Horizontal Alignment, Production of Plan and Profile Drawings and Preparation of BOQ.
Software used: MXROAD Windows Profession

Alignment and Formation Design Engineer

DFCCIL

From December 2013

PROJECT (1): Project Management consultancy services for Bhaupur-Khurja section of Eastern DFC Project-1.
CLIENT: DFCCIL
FUNDING AGENCY: World Bank
DESIGNATION: Alignment and Formation Design Engineer.
RESPONSIBILITIES:
In this project I have been doing the Review of Geometric Design of Railway Alignment, Plans and specifications, Adequacy of Survey ground Control Stations and Detailed Design Drawings.
Software used: Power Rail Track V8i

Deputy Project Manager

Leighton Contractors

(India) Pvt Ltd
DESIGNATION: Deputy Project Manager.
RESPONSIBILITIES:
In this project I did the Site Appreciation and Road Inventory, Co-ordination in conducting Engineering surveys, Regeneration of geometric alignment .modifications and quantifying the earthwork, Pavement Design, Preparation of BOQ and Report and Liasoning with client.
Software used: MX XM V8i

Deputy Project Manager

IDFC

DESIGNATION: Deputy Project Manager.
RESPONSIBILITIES:
In this project I did the Identification & Study of Different Alternative Alignments, Highway alignment & Pavement Design and Preparation of Report.
Software used: MX XM V8i

Assistant Manager

CPWD

PROJECT(19): Preparation of Detailed Project Report Development of State Highways in the state of Bihar under Rashtriya Sam Vikas Yojna(RSVY) Pkg No.-12 (length 110.750km) (Section of Madhepura and Purnea).
CLIENT: CPWD
DESIGNATION: Assistant Manager.
RESPONSIBILITIES:
In this project I did the Checking and Analysis of Topo Survey Drawing and Data, Generation of Digital Terrain Modeling of Existing Ground, Design of Horizontal Alignment, Design of Vertical Alignment, Generating Cross Sections and Production of Plan and Profile and Cross Section Drawings.
Software used: MXROAD Windows Profession

Senior Project Manager/Project Manager

National Highways Authority of India

November 2011 - November 2013

PROJECT (2): Preparation of Detailed Project Report for up gradation of UDAIPUR (NH-8) Kundal-Nayakheda-Jhadol-Som-Nalwa-Daiya (Gujarat Border)-IDAR (NH-58 .) in Rajasthan and Gujarat.
CLIENT: National Highways Authority of India
DESIGNATION: Senior Project Manager/Project Manager.
RESPONSIBILITIES:
In this project I did the Site Appreciation and Road Inventory, Co-ordination in conducting Engineering surveys, Guidance to Geometric Designer, Traffic Analysis, Pavement Design, and Economic Evaluation by HDM-IV, Financial Analysis, Preparation of Report and Liasoning with client

Deputy Project Manager

SAI Consulting Engineers Pvt.Ltd

October 2011 - November 2011

New Delhi.
PROJECT (3): Pretender Engineering of Four laning of Lucknow-Raebareily section of NH-24B.
CLIENT: L & T Transco Pvt Ltd
DESIGNATION: Deputy Project Manager.
RESPONSIBILITIES:
In this project I did the Site Appreciation and Road Inventory, Co-ordination in conducting Engineering surveys, Regeneration of geometric alignment, modifications and quantifying the earthwork, Pavement Design, Preparation of BOQ and Report and Liasoning with client.
Software used: MX XM V8i

SAI Consulting Engineers Pvt.Ltd

September 2011 - October 2011

New Delhi.

Deputy Project Manager

MORTH

Preparation of Feasibility Report for Two laning with Paved shoulders from Varansi(km 2.225) to Gorakhpur(km 211.250) Section of NH-29 Through PPP on DBFOT Basis.
CLIENT: MORTH
DESIGNATION: Deputy Project Manager.
RESPONSIBILITIES:
In this project I did the Site Appreciation and Road Inventory, Co-ordination in conducting Engineering surveys, Traffic Analysis, Pavement Design, Preparation of Report and Liasoning with client.
Software used: MX XM V8i

Independent Engineer

SAI Consulting Engineers Pvt.Ltd

From August 2010

for Jaipur-Reengus section of NH-11(Length: 50kms).
CLIENT: NHAI
Concessionaire: Reliance Infrastructure
DESIGNATION: Highway Design Engineer.
RESPONSIBILITIES:
As a Key Person in this project I did the Reviewing all design and drawings of plan and profile of Carriageway and service road, junctions, Grade Sepaerators, Underpasses Toll plaza, Drainage. Road signage and Markings, Site Inspection and Meeting with design consultants, Concessionnare and Authority.
PROJECT (6): Preparation of Detailed Project Report for Two laning with Paved shoulders from Ghigarikhal(km 109) to Diwalikhal (km 200)Section of NH-87E.
CLIENT: MORTH
FUNDING AGENCY: World Bank

Deputy Project Manager

SAI Consulting Engineers Pvt.Ltd

February 2010 - June 2010

section of NH-2.
CLIENT: L & T Transco Pvt Ltd

Deputy Project Manager

L & T Transco Pvt Ltd

DESIGNATION: Deputy Project Manager.
RESPONSIBILITIES:
In this project I did the Site Appreciation and Road Inventory, Co-ordination in conducting Engineering surveys, Regeneration of geometric alignment .modifications and quantifying the earthwork, Pavement Design, Preparation of BOQ and Report and Liasoning with client.
Software used: MX XM V8i

Deputy Project Manager

SAI Consulting Engineers Pvt.Ltd

October 2009 - November 2009

section of NH-58.
CLIENT: L & T Transco Pvt Ltd

SAI Consulting Engineers Pvt.Ltd

August 2009 - September 2009

New Delhi.

SAI Consulting Engineers Pvt.Ltd

February 2009 - August 2009

New Delhi.

Deputy Project Manager

Co-ordination in conducting Engineering

September 2009 - October 2009

DESIGNATION: Deputy Project Manager.
RESPONSIBILITIES:
In this project I did the Site Appreciation and Road Inventory, Co-ordination in conducting Engineering surveys, Regeneration of geometric alignment .modifications and quantifying the earthwork, Pavement Design, Preparation of BOQ and Report and Liasoning with client.
Software used: MX XM V8i
DURATION: September 2009 to October 2009.

SAI Consulting Engineers Pvt.Ltd

May 2008 - February 2009

New Delhi.

SAI Consulting Engineers Pvt.Ltd

April 2008 - May 2008

New Delhi.

SAI Consulting Engineers Pvt.Ltd

December 2006 - March 2008

New Delhi.

CONTRACTOR

Feedback Turnkey Engineers Pvt.Ltd

February 2006 - December 2006

New Delhi.
PROJECT (17): Four Laning of Salem-Coimbatore section of NH-47 from km 0.000 to km 100.000 on BOT Basis
CLIENT: National Highways Authority of India
CONCESSIONNAIRE: IVRCL Infrastructures & Projects Ltd.
DESIGNATION: Assistant Manager.
RESPONSIBILITIES:
In this project I did the Finding Deficiencies in DPR done by DPR Consultants, Checking and Analysis of Topo Survey Drawing and Data, Generation of Digital Terrain Modeling of Existing Ground, Regenerating Horizontal Alignment, Design of Vertical Alignment, Generating Cross Sections, Production of Plan and Profile and Cross Section Drawings and Generating Details of Alignment Report.
Software used: MXROAD Windows Profession
PROJECT(18): Rehabilitation and Up gradation from km 75.000 to km 80.960 in the Town of Kanpur (Including Bridge across Ganga River) to 4-lane divided Carriageway Configuration Contract Package EW-6/UP
CLIENT: National Highways Authority of India
CONTRACTOR: M/S Gammon India Pvt Ltd.
DESIGNATION: Assistant Manager.
RESPONSIBILITIES:
In this project I did the Modification of Horizontal and Vertical alignment, Modification of Typical Cross Sections and Production of Plan and Profile including Cross Section Drawings.
Software used: MXROAD Windows Profession

Asst.Highway Engineer

Span Consultants Pvt Ltd

February 2005 - January 2006

New Delhi.
PROJECT(20): Preparation of Detailed Project Report for 4/6 lanin of Hajpur - Chapra- Gopalgunj Section of NH-9 NH-85(NH-85-KM 0.000 TO KM 93.00), (NH-19-KM 143.00 to KM 207.00) in the State of Bihar.
CLIENT: National Highways Authority of India
DESIGNATION: Asst.Highway Engineer
RESPONSIBILITIES:

In this project I did the Checking and Analysis of Survey Drawing and Preparation of Digital Terrain Modeling, Horizontal Alignment Design, Vertical Alignment Design, Design of Profile of the ROBs, Flyovers and Underpasses, Proposal of Culverts, Provision of Service Roads and Production of Plan and Profile and Cross Section Drawings.

Software used: Inroads
PROJECT(21): Preparation of Detailed Project Report for 4/6 lanin of Eastern Peripheral Expressway around Delhi(From km 36.490 of NH-1 at Kundli to km 69.330 of NH-2 Palwal) connecting Faridabad-Noida-Ghaziabad-Kundli in the State of U.P. Haryana.
CLIENT: National Highways Authority of India
DESIGNATION: Asst.Highway Engineer
RESPONSIBILITIES:
In this project I did the Conducting Traffic Surveys Volume Count Survey, O-D Survey and
Registration Survey.
PROJECT(22): Minor Improvements to National Highways(NH-; km 96. At Panipat to km 372.0 at Jalandhar).
(NH-: KM 355.0 at Chilakalripeta to km 434.150 at Vijayawada to km 80.000 at Eluru).
(NH-2: KM 398.4, Barwai Add-Barkal-Ranianj-Panigarh km 515.200).
CLIENT: National Highways Authority of India
DESIGNATION: Asst.Highway Engineer
RESPONSIBILITIES:
In this project I did the Improvements of Median, Median Islands and Channel Islands, Acceleration lanes Deceleration lanes and Right turning lanes, Provision of Simple Curves and Compound Curves the Left Turnings, Position of Islands, Median Gaps, According to Design Vehicle path and Provision of Markings and Traffic Signs.
PROJECT(23): Detailed Feasibility Study of Barn-Mangrol-Sawai-Madhopur - Bharatpur-State of U.P. Border Section of SH-19 , SH-24 , SH-29 (Total km 350) in Rajasthan..
CLIENT: Road...

Asst.Highway Engineer

EMA Unihorn

July 2003 - January 2005

RESPONSIBILITIES:
In this project I did the Checking and Analysis of Survey Drawing and Preparation of Digital Terrain Modeling, Horizontal Alignment Design, Vertical Alignment Design, Design of Profile of the ROBs, Flyovers and Underpasses, Proposal of Culverts, Production of Plan and Profile and Cross Section Drawings and Preparation Alignment Report and Setting out Data.
Software used: Inroads
DURATION: July 2003 to Jan 2005
COMPANY: EMA Unihorn (India) Pvt. Ltd. (Formerly Known as
Engineers and Management Associates),, New Delhi.
PROJECT (25): Preparation of DPR for 4/6 laning of Gwalior (km0.00)-Jhansi (km 103.00) section including Gwalior Bypass of NH-75 in the state of M.P. & U.P.
CLIENT: National Highways Authority of India
DESIGNATION: Assistant Highway Engineer.
RESPONSIBILITIES:
In this project I did the Preparation of Strip Plan, Assisting in planning Alignment for Highway including Bypasses, Organizing Traffic Surveys, Axle load survey and analysis of data and Assisting in Land Acquisition & Utility Shifting Plan preparation.
PROJECT (26): Structural Evaluation & Design of Overlay of
Runway, Apron, & Taxiway for the Khajuraho Airport by using" Falling Weight Defloctometer
CLIENT: Airport Authority of India, Khajuraho.
RESPONSIBILITIES:

In this project I did the Measurement of Pavement Deflection by FWD, Collection of Secondary data like Present and Future Traffic Pavement Composition & Maintenance history and Sub grade type and strength.
PROJECT (27): Structural Evaluation & Design of Overlay of
Container Terminals by using" Falling Weight
Defloctometer.
CLIENT: City Industrial Development Corporation (CIDCO) of
Maharashtra.
RESPONSIBILITIES:

In this project I did the Measurement of Pavement Deflection by FWD, Collection of Secondary data like Present and Future Traffic Pavement Composition & Maintenance history Sub grade type and strength.

PROJECT (28): Preparation of DPR for 4/6 laning of Jhansi (km0.00) Bhognipur (km 255.00) section of NH-25...

Assistant Highway Engineer

ENGINEERS AND MANAGEMENT

July 2001 - July 2003

RESPONSIBILITIES:

In this project I did the Preparation of Strip Plan, Assisting in planning Alignment for Highway including Bypasses, Organizing Traffic Surveys, Axle- load survey and analysis of data, Project Road Inventory and Pavement condition survey, Conducting BBD Survey and Analysis of Data, Borrow Area Investigation.
DURATION: July 2001 to July 2003
COMPANY: ENGINEERS AND MANAGEMENT
ASSOCIATES, New Delhi
PROJECT (29): "Strengthening, Widening and Raising of Ropar -
Blachaur-Phagwara Road"
CLIENT: Punjab Infrastructure Development Board
DESIGNATION: In-Charge of Quality Control at site
RESPONSIBILITIES:
In this project I did the Testing of Materials of Soil, Aggregate, Bitumen, Design of Mix of GSB, WMM, BM, DBM, and BC, Conducting of required tests in lab and field as per MORTH SPECIFICATIONS and PIDB Quality Control Manual according to frequency, Monitoring Quality Control at site and Administration of Staff.

I am also involved in the preparation of Technical proposals and Expression of Interests for bidding for various projects. The nature of work involved is preparation of methodology, task series, and vitae of key professionals, project sheets, manning scheduled and site appreciation.
AREAS OF INTERST:
Detailed design of highways and Pavement design.
DECLARATION:
I hereby declare that the above-furnished details are true to the best of my knowledge and belief and correctly describe my qualification and experience.

Date: 02-07-2014
Place: New Delhi

Deputy Project Manager

L & T Transco Pvt Ltd

DESIGNATION: Deputy Project Manager.
RESPONSIBILITIES:
In this project I did the Site Appreciation and Road Inventory, Co-ordination in conducting Engineering surveys, Regeneration of geometric alignment .modifications and quantifying the earthwork, Pavement Design, Preparation of BOQ and Report and Liasoning with client.
Software used: MX XM V8i

Deputy Project Manager

SAI Consulting Engineers Pvt.Ltd

New Delhi.
PROJECT (9): Pretender Engineering of Four laning of Rohtak Bawal section of NH-71.
CLIENT: L & T Transco Pvt Ltd
DESIGNATION: Deputy Project Manager.
RESPONSIBILITIES:
In this project I did the Site Appreciation and Road Inventory, Co-ordination in conducting Engineering surveys, Regeneration of geometric alignment .modifications and quantifying the earthwork, Pavement Design, Preparation of BOQ and Report and Liasoning with client.
Software used: MX XM V8i

Qualifications & Certifications

Transportation Engineering

Regional Engineering College

Civil Engineering

J.N.T.U. College of Engineering

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Are you sure that you want to leave?

   
Supported Countries
Choose your country

×