Javadi - Electrical Engineer - Dubbo, NSW, Australia

Majid Javadi

Dubbo, NSW, Australia

Summary

A competent Senior Electrical Engineer and a member of the Institution of Engineers Australia (MIEAust,NPER, CPEng) with 16 years relevant work experience.
I’m a qualified Electrical Engineer with a background of Electrical & Instrumentation Design, Installation, Inspection and Commissioning and also project management.

Services

Electrical Engineer

Work History

Operations Engineer (Electrical)

Green Distillation Technologies Pty Ltd

From April 2013

Responsibilities:
• In cooperation with mechanical design engineers and the technical director, fully responsible to the
design of all electrical and control systems, installation and commissioning for a commercial plant.
• Responsible for the creation, from scratch, of electrical distribution diagrams for plant,
load calculations, motor/consumer list, distribution switchboards design, MCC`s & PLC`s designs,
electrical & control room, process equipment and appliances, etc.
• Prepare/supervise wire and voltage rating calculations, cables dimensioning & calculations for the
entire plant, and earthing calculation & layout.
• Based on P&ID, prepare/supervise the electrical design of process controls,
instrumentation, data collection and automation systems within the plant.
• Coordinate and lead electrical design review at various stages of the plant project.
• Monitor and report performance on electrical projects budgets.

Operations & Electrical Engineer

Green Distillation Technologies Pty Ltd

June 2012 - March 2013

• As an Operations & Electrical Engineer in this company, I provide engineering input to develop and oversee the design, installation and maintenance of electrical system (plant establishment), manage automation and PLC systems to facilitate the overall operation of the plant to achieve production and research objectives (operations) and also I do other general duties for R&D and plant operations.

porject manager

Control Gostar Jahed

June 2011 - January 2012

• As a Project Manager for the following Design projects, a part from leading a design team of 7 people (3 engineers & 4 technicians) and managing relevant contracts, I contributed in designs and assisted the team and finally I reviewed and checked all designs. We had many effective meetings with our clients during designing.
- All Electrical, Instrument & Control designs of Pelletizing plant with a capacity of 2.5 million tons of DR grade pellets per year. (The total cost for design & procurement of electrical, instrumentation and control systems was more than $3,000,000)
- All Electrical, Instrument & Control designs of sugar cane belt conveyors. (The total cost for all designs, procurement and performance was about half million dollars)
• I was responsible for procurement, performance and commissioning of belt conveyors.

• And also I traveled to Aalborg/Denmark and passed a training course of CUBIC Company for manufacturing LV & MCC panels, date: (03/10/2011- 14/10/2011).
• The employer had the greatest satisfaction of my service.

Site Superintendent

Pasargad Oil

February 2010 - May 2011

• A part from my position as a site superintendent in Tehran factory I was responsible for all Electrical Designs (L.V & M.V) in that project to review, check and approve and also responsible for all constructions, electrical manufacturing & procurement and installation as a Site Superintendent.
• I handled two contractor companies. The total cost for this renovation electrical power system was about $4,000,000.
• During a/m duties, I was responsible for the following Design projects to review, check and approve all Designs, and I accomplished them:
- All Instrument & Control designs for a Bitumen Factory in Abadan. The total cost for the entire project was about $35,000,000.
- All Instrument & Control designs for an Exporting Terminal project in Bandar Imam.
• And also I was Electrical & Instrument equipment inspector in Pasargad Oil Co. and in some cases I did Electrical & Instrument troubleshooting and maintenance.
• In all designs I used Standards including: IEC, BS, API, IPS, NIOEC,
• I participated in Commissioning of Exporting Terminal in Bandar-Abas and Incinerator in Arak refinery with Thermo Engineering Co. (Italy).

Electrical Engineer

Iranian Industrial Consulting Engineers

January 2008 - October 2008

• I Designed the electrical system of Non Industrial Building(NIB) of the biggest gas
Plant Project in Iran located in Asaluiye adjacent of Persian Gulf in terms of
power distribution, lighting system, lightning system, earthing system, etc. according to IEC and BS standards.
(part time)

Head of Electrical Inspection & Supervision

Falegh Sanat

August 2001 - March 2010

• I was in charge of all the electrical equipment inspection and manufacture supervising in sugar cane factories and I inspected all electrical equipment & instrumentation including: MCC panels, M.V. & L.V. switchgears (particularly Siemens products like 8PT, 8BK20 with Electro Kavir Co. co-operation), control panels, Cables, Field Instrument and etc. The average total cost for each factory was about $150,000,000. I obtained extensive experiences in Inspection.
• I was a supervisor for Installation & Commissioning of electrical & instrument systems, (e.g. Centrifugal machines, all type of Electrical
panels, Electromotors, Cabling, Control & PLC panels, Instrumentation and etc) and co-operated with supervisors from foreign countries.
• I was not just reviewing and checking Electrical & Control designs before manufacturing and procurement, but also preparing proposals, evaluating relevant tenders and contracts. I was responsible for the procurement process.
• During factories operation in some cases I did Electrical & Instrument troubleshooting and maintenance.
• A part from my position:
- I Designed all LV & MV MCC panels for a sugar cane factory.
- I Designed all electrical, Instrument & Control systems of Water Treatment Plant (WTP) including: MCC single line & wiring diagram, Cabling & Cable Calculation, Logic Diagram, Loop Diagram, PLC wiring diagram, Instrument list, etc.
• I used IEC standards all the time and some other standards including: BS and VDE.
• I traveled to Spain for Instrumentation inspection in Foster Wheeler Co. date: (29/10/2003 – 10/11/2003) and also I traveled to Turkey for power transformers inspection in Areva Co. date: (15/08/2005 – 19/08/2005).
• The employer had the greatest satisfaction of my service assigned to me.

Instrument Engineer

Shakhes

July 2000 - August 2001

• I was responsible in instrument maintenance in Paraxylin plant in Bandar Imam petrochemical phase1 and I was head of a maintenance team.
I worked and co-operated with BIPC operators, my team and I give them all instrumentation services like maintenance, calibration, adjustment.
• The employer had the greatest satisfaction of my service and conduct.

Electrical & Instrument Supervisor

Falegh Sanat

January 1999 - February 2000

• I was supervisor for Installation & commissioning of all electrical & instrument systems
Including: power transformers, sub-stations, power distribution, M.V&L.V switchgears, MCC panels, PLC & DCS panels, cabling, conveyors, milk of lime, boiler, power house, field instrument in raw sugar house and co-operate with supervisors from foreign countries.
• The employer had full satisfaction of my service.

Electrical Technician

Civil Organiztion

June 1995 - October 1996

• Locomotive repair and renovation plants project in railway station in Karaj.
I was Electrical technician in electrical department in construction supervising of electrical system including: Power transformers, Switchgears, Power distribution systems (M.V&L.V), cabling, cable tray & ladder, Indoor-outdoor Lighting system, earthing system, lightning system.
• The employer had the greatest satisfaction of my service and conduct.

Electrical Technician

Civil Organization (Shahid Noori Project)

June 1995 - October 1996

• Locomotive repair and renovation plants project in railway station in Karaj.
I was Electrical technician in electrical department in construction supervising of electrical system including: Power transformers, Switchgears, Power distribution systems (M.V&L.V), cabling, cable tray & ladder, Indoor-outdoor Lighting system, earthing system, lightning system.
• The employer had the greatest satisfaction of my service and conduct.

Qualifications & Certifications

Bachlors degree

Karaj Azad University, Iran

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Are you sure that you want to leave?