Shiranni - Mechanical Engineer - Karwar, Karnataka, India

Mahesh Sg Shiranni

Karwar, Karnataka, India

Summary

Mechanical Engineer with 12+ years exp in the field of operation and maintenance of Power Plant with BOE Certification.
Has commissioned 2 afbc boilers and one travel grate boiler.
3 + years of experience in ISO auditing
i am on skill page to get a job in relevant location.

Services

Mechanical Engineer

  • Full time
  • Part time
  • One time
  • Contract
  • Temp

Summary:

12 + years of experience in working with power plants. experienced in operation and maintenance of different types of boilers. BOE certified and Certified internal auditor.

Work History

Dy.Manager

Kirloskar Ferrous Industries

From November 2012

I am responsible for Operation and maintenance of 2X 3.5 MW, 1x 4.5 MW Power Plant, Operation and maintenance of 1X 7.5 M3/ hr, 1X 15 M3/ hr DM plant, Internal Auditor for EMS/OHSAS system.

Dy.Manager

Bevinhalli

From November 2012

Koppal KARNATAKA. Which is the leading manufacturer of foundry grade pig iron and automotive spare parts for Mahindra & Mahindra, Volvo, Daimler and Eicher. I am working as a Dy.Manager for operation and maintenance of 3.5 X 2 and 4.5 MW captive thermal power plant from November-2012 to till date.

Company profile:
Kirloskar Ferrous Industries is a leading manufacturer of foundry grade pig iron with manufacturing capacity of about 900 MT per day. And which has 3.5 X 2 and 4.5 MW power plant and beside that it has foundry for automotive spare part manufacturing and siter plant.

Job knowledge:
Looking after the shift operation & maintenance of high pressure boiler, steam turbine and spares management, indent raising etc.
Responsible for:

➢ Operation & maintenance of -
➢ 19 X 2 and 30 TPH Thermax BF gas fired boilers & its associated auxiliary.
➢ 2 X 3.5 MW Coppus Mourrey turbine and 1 X 4.5 Triveni turbine & its auxiliary.
➢ With operating system like SCADA.
➢ Woodward 505 governor control system.
➢ 7.5 and 15 M3/hr DM plant
➢ Asst. Coordinator for ISO and 5s for Power plant dept.

First assignment

Executive

Aparant Iron And Steel PVT LTD

January 2010 - October 2012

Costi, Kalay GOA. A part of DEMPO group, its leading manufacturer of pig iron and an ISO 9001:2008, 14001:2004, OSHAS 18001:2007, certified company. I am Working as Executive (Shift In charge) for operation and maintenance of 4MW captive thermal power plant from January-2010 to Oct-2012.

Company profile:
Aparant Iron and Steel pvt ltd is a leading manufacturer of pig iron with manufacturing capacity of about 450 MT per day. And which has captive thermal power plant of 4MW generation capacity along with DG sets of generation capacity 1.2 X 3.

Job knowledge:
Looking after the shift operation & maintenance of high pressure boiler, steam turbine and DG sets.

Responsible for:
➢ Operation & maintenance of -
➢ 22 TPH Thermax BF gas fired boilers & its associated auxiliary.
➢ 1 X 4 MW Triveni turbine & its auxiliary.
➢ With operating system like SCADA.
➢ Woodward 505 governor control system.
➢ 1.2MW X 3 L&T DG sets.
➢ Asst. Coordinator for ISO for Whole compay.

Second assignment:

Sr.Engineer mechanical

DESEIN PVT LTD

November 2008 - December 2009

for operation & maintenance of 1X 24 MW co-generation thermal power plants which is 1st phase of 72 MW of m/s Godavari sugar mills ltd, somaiya group of companies, Karnataka.from November-2008 to Dec-2009.

Company profile:
Desein pvt ltd., is a leading consulting company dealing in power project with especially in designing, O&M, EPC.it is having allover India & also abroad.my present site is GSML sameerwadi site, karnatak. 1 X 24 MW co-generation thermal power plant. It is having DCS & PLC's & all over automations.

Job knowledge:
Looking after the shift operation & maintenance of high pressure boiler and steam turbine.

Responsible for:
➢ Operation & maintenance of -
➢ 130 TPH Mitsui-Babcock boilers & its associated auxiliary.
➢ 1 X 24 MW BHEL double extraction cum condensing turbine & its auxiliary.
➢ With latest operating system like DCS (CENTUM CS-3000 Yokogawa)
➢ TMR governor control system.


Third assignment:

Dy.Plant Manager

M/s Deepak Steels And Power Ltd

May 2007 - October 2008

Worked with OEG India Ltd, Chennai A leading O&M services for power Plant. I am working as Dy.Plant Manager for operation of 1X10 MW captive power plant of M/s Deepak Steels And Power Ltd, Barbil Orissa. From May-2007 to October-2008.

Job knowledge
Commissioning of 1x10 MW captive thermal power plant and shift operation of high pressure boiler and steam turbine, Maintenance of Boiler auxiliaries, Turbine and its auxiliaries, DM plant and its equipments, Coal handling system, Ash handling system, etc..

Responsible for:
➢ Operation &maintenance of -
➢ 20 TPH CVPL AFBC boilers & its associated auxiliary.
➢ 2X10 and 2X5 TPH THERMODYNE WHR Boilers and its auxiliary
➢ 1 X 10 MW KESSELS condensing turbine & its auxiliary.
➢ With latest operating system like DCS (ROCKWELL AUTOMATION)
➢ Woodward 505 governor control system.

Fourth assignment:

Panel Engineer (Desk Engineer)

ENMAS PVT LTD

December 2006 - May 2007

for operation and maintenance of 1X 25 MW captive power plants of M/s Gallentt metals Ltd, Gujarat. From December-2006 to May-2007.

Job knowledge
Commissioning of 1x25 MW captive thermal power plant and shift operation of high pressure boiler and steam turbine.

Responsible for:
➢ Operation &maintenance of -
➢ 105 TPH Thermax B&W AFBC boilers & its associated auxiliary.
➢ 1 X 25 MW Hang Zhou extraction, condensing turbine & its auxiliary (Air cooled condenser).
➢ With latest operating system like DCS (CENTUM CS-1000 Yokogawa)
➢ Woodward 505 governor control system.

Fourth assignment:

Asst Engineer

DESEIN PVT LTD

October 2004 - December 2006

mechanical for operation & maintenance of 1X 24 MW co-generation thermal power plants which is 1st phase of 72 MW of m/s Godavari sugar mills ltd, somaiya group of companies, Karnataka.from October-2004 to December-2006

Fifth assignment:

➢ Worked as a Supervisor for K.G.KHOSLA Compressors Ltd. Under the construction work of 210MW Thermal Power Plant compressor house.

Working Profile:-
➢ Erection, Commissioning, Instruments fixing and P.G testing of Air compressors and Air drier.
sixth assignment:

➢ Worked as a Supervisor for Ch.Venkateshwara Rao Contractors. Under the mentainance work of Coal Handling plant stage - II at Raichur Thermal Power Station.

Working Profile:-
Maintenance of Crusher and Allied Equipments of Coal Handling plant. The Equipments are such as Ring hammer mills, Conveyors, Gear Boxes, Fluid Couplings, Pulleys, Gates etc.

Qualifications & Certifications

Diploma in Mechanical Engineering

HKE's Polytechnic Raichur

RTPS High School Karnataka

Mechanical Engineering

H.K.E's Polytechnic

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Mahesh Sg Shiranni provides the following services:


Supported Countries
Choose your country

×