Summary

To work in a Dynamic & Growing Organization, where I become the key person & am an asset to the establishment.

Services

Manager-PPC, Q.A Manager, M.R. For ISO 9001:2008, NDT Level -II,

Summary:

1. Inspection of material at raw material stage
a. QAP for raw material inspection
b. QAP for In Process Inspection
c. QAP Final Inspection
2. Qualified Internal Auditor for ISO 9001:2008 worked as an Management Representative
3. NDT Level II (Dye Pe

Work History

QA/QC - Manager

High Pressure Hydro Pneumatic Press

From April 2013

High Pressure Hydro Pneumatic Pump, High Pressure Hydro Pneumatic Valves & High Pressure Hydro Pneumatic Cylinders.
Job Responsibilities:
1. Production Planning Weekly, Monthly, Raw Material Planning, Long Term & Short Term Planning of Machined parts & Hardware's. In House Machining & Machining at Vendor, Planning of Men & Machines, Planning of Dispatches,
2. Assembly & Dimensional checks as per Manufacturing Drawing & Testing of complete assembly for leakage.
3. Handling Customer inspection before dispatches & Satisfying customer through Demo.
Sale Turn over: 15 Crores.

Sales T.O. 2 Cr

J.D. Fabricators

ASIAN PAINTS. Bhandup.
Area of Business: Job-work activities - Involving: Heavy Fabrication / Machining / Piping / Erection.
Sales T.O. 2 Cr.

Manager-Production Planning & Control, QA/QC Head

Aluminum Compact Heat Exchangers

From June 2006

Air Cooled Inter coolers & After coolers for Air Compressor, Industrial & Railway Locomotives, Oil Coolers for Earth Moving Equipments. Air / Water Cooled Charge Air Coolers for Diesel locomotives, Oil Coolers for EMU for Railway packaged cooling unit for Defense application for combat vehicles, consisting of Charge Air Cooler, Hydraulic Air Cooler, Lube Oil Cooler, and Radiator.
Job Responsibilities: Areas of Responsibilities includes for both the companies:
Quality Assurance - Incoming Inspection / In Process Inspection /
Final Goods Inspection / Raw Material Check Sheet / Purchase Order
Specification / Handling Third Party Inspection / Maintaining Records of
Calibration of Measuring Instruments. Jigs & Fixtures. Product Process Diagram,
Time & Method Study -Reports Generation & Analysis & Documentation for above tasks.
Name of the Organization: Apollo Industrial Corporation Vasai.
Area of Business: Diesel Locomotive Parts
At present company manufactures following products
1) Fuel Injection Tubes for Diesel Locomotives. 2)Fuel Pressure Pipe ( Connecting )

Sales T.O. - 3 Cr

Gautam Engineering

DISTRIBUTION OF JOBS TO SHOP FLOOR, MEETING PRODUCTION TARGET SET BEFORE US BY THE MANAGEMENT.

Sales T.O. - 10 Cr

Name of the Organization

UNIVEST TECHNOLOGIES PVT.LTD.

Area of Business: Manufacture of Industrial Emergency Safety Equipments & Life saving equipments.
Manufacture of Respiratory Mask / Industrial Safety Showers / Eye Wash / Safety Belts /
Safety Helmets / Live Jackets etc.
Sales T.O. - 10 Cr.

Sales T.O. - 18 Cr

Name of the Organization

Palghar.
Area of Business: Manufacturing of Fire Fighting equipments & Fire Extinguishers. ( Portable & Trolley mounted of all types of Fire Extinguishers. water Monitors, stand post & Trolley mounted, Hydrant system, Sprinkler system, etc.
Sales T.O. - 18 Cr.
Designation Held: Factory Manager

Tenure since Dec 2001 to Dec 2005
Job Responsibilities: Areas of Responsibilities Included:

Manager-Production Planning & Control, Raw Material Planning, Job Work Vendor Planning,

Mercury Pneumatics Pvt Ltd.

April 2003 - July 2004

Production Planning, Daily, weekly, monthly, Dispatch schedule, planning of men & Machine, handling vendors, raw material planning, maintaining min & max. stock

Q.A. Head / Management Representative (M.R.) for two companies

Name of the Organization

Vasai.
Designation Held: Q.A. Head / Management Representative (M.R.) for two companies.

Manager- Production Planning & Control

Mercury Pneumatics Pvt. Ltd

OVERALL PRODUCTION PLANNING & EXECUTION, RAW MATERIAL PLANNING, VENDOR PLANNING, SCHEDULING OF JOB, INTERACTING WITH CUSTOMER, DELIVERY AS PER PLAN, ACHIEVING & MEETING PRODUCTION TARGETS, PREPARING M.I.S.

Manager-Production Planning & Control

MAK

5) Nozzle Cooling Sleeve ( SS ) 6) Nozzle Holder Sleeve ( Brass ) ( BEML )

QA Planning & Documentation

Management Review Meeting

M.R. Responsibilities for both the Companies (ISO 9001: 2001)
Documentation Review, Conducting Internal Audits, External
Audits, Management Review Meeting, Making Minutes of the meeting.
QA Planning & Documentation, with Material T.C. part Inspection,
Stage wise inspection on the shop floor.
Maintaining good housekeeping in the plant, along with Workers Training, Safety Issue etc.
Sales Turn over. - 10Cr

QA Planning & Documentation

Documentation for ISO

Manufacturing / Designing / Coating / Quality Assurance Plan for all the processes for all the products. Handling 3rd Party Inspection Suppliers & Contractors Performances. Documentation for ISO 9001: 2000.
Other Tasks Included:
Production Planning on Daily / Monthly basis to the Mgt. Project Planning & Coordination with all departments. QA Planning & Documentation, with Material T.C. Part Inspection Costing & Project Estimation. Workers Training, Safety Issue etc. ISI - Registration & its Compliances, Product testing / Documentations / Trials / Performance Reading, etc. Workers Rating & Housekeeping.

Engineer in charge / Factory Manager

Party Inspection / Supplier & Contractors Performance

Job Responsibilities:- Areas of Responsibilities included:
Manufacturing / Designing / Costing / Quality Assurance / Handling 3rd Party Inspection / Supplier & Contractors Performance, Vendor Development, Documentation of ISO 9001:2000
Other Tasks included:
Production Planning on daily / Monthly basis to the Management. Project Planning & Coordination with all the departments. QA Planning & Documentation with material T.C. Part Inspection Costing & Project estimation. Workers training, Safety issue etc.
ISI / MMD / DEBEL - Approval, Registration, & its Compliances, Product Testing / Documentation / Trials / Performance Recording, workers rating & House keeping.

Fabrication Engineer

Third Party Inspection

Job Responsibilities: Areas of Responsibility Included:
Manufacturing / Designing / Costing / Quality Assurance - Third Party Inspection.
Other Tasks Included:
Production Planning on a Daily / Monthly basis to the Management.
Project Planning & Coordination with all Departments. Q.A. Planning & Documentation, with material T.C. Part Inspection Costing & Project Estimation. Product Testing / Documentation / Trials, workers Training & House keeping.

Fabrication Engineer / Engineer In charge

Costing

Job Responsibilities: Area of Responsibilities Included:
Manufacturing / Designing / Costing.
Other Tasks Included:
Production planning on a Daily / Monthly basis to the Management. Project Planning & Coordination with all departments. QA Planning & Documentation, Part Inspection, Costing & Project Estimation.
Product Testing / Documentation / Trials etc.
Workers Training & House keeping, Maintaining Paint Manufacturing Equipments - Reactors / Mixers etc. Dismantling / Assembly / Erection of Equipments / Plant.

Projects

JIG SAW MACHINE

CUTTING INTRICATE DESIGN, CUTTING DIFFERENT SHAPE & SIZE.

Qualifications & Certifications

B.E. MECHANICAL ENGINEERING

Gulbarga University

GOVT HIGH SCHOOL YADGIRI DT: GULBARGA (K.S.)

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Are you sure that you want to leave?