Sabtal - Sr Piping Supervisor - Kuantan, Pahang, Malaysia

Mohd Noor Sabtal

Kuantan, Pahang, Malaysia

Services

Sr Piping Supervisor

Summary:

FULL SKILLED IN ANY SUPERVISION MATTERS

Work History

Piping Supervisor

Toyo Thai Malaysia

February 2012 - April 2013

Project Involved: Lynas Phase Two Project Tmn Perindustrian Gebeng Kuantan Pahang

CURRICULUM VITAE
Scoop of Work
➢ Reviews project drawings and specification in relation with formulating effective working procedure and perform quality of work and production
➢ Maintain record /files of all the necessary document of every activities pertaining to specification design materials dimension and procedures to be carried out at work site
➢ Prepare daily work plant and safety precaution before execution of any activities at site
➢ Ensure that all are correct materials, orientation and dimension before and after during fit/up, both fabrication, medication and erection
➢ Attained daily and weekly coordination meeting with lynas representative
➢ Request for NDT etc, ( PT, MT, RT, PWHT and PMIV &HT ) on project as per specification requirement code and standard
➢ Perform line check, joint with client representative and closed punch list work item
➢ Arrange and Assign Crews to their respective areas and provide materials, tools &equipment
➢ Supervised and responsible for distribution of manpower to the respective assignment for erection team
➢ Provide daily progress report and feet back to project management

Production Supervisor

K N M

March 2010 - October 2012

Project Involved: Koniambo 30m ID steel Tank /Pressured Vessel / Steel Structured Colum

Scoop of Work
➢ Prepare daily work plant and safety precaution before execution of any activities
➢ Supervising of work, coordinate with subcontractor
➢ Reviewed and up-date iso-metric drawing to ensured new revision before issued to fabrication work shop and site installation for the implementation
➢ Ensure that all are correct materials, orientation and dimension before and after during fit/up, both fabrication, medication and erection
CURRICULUM VITAE

➢ Supervised and review packages document to assure all QA/QC requirement are complete
➢ Prepared work schedule plan and check list procedure in accordance with the project Requirement
➢ Prepared requisition on materials and fittings accessories to warehouse and fabrication shop
➢ Prepared and witness bolt tensioning report based on iso metric drawing
➢ Provide daily progress report and feet back to project management

Piping Supervisor

FOSTER WHEELER E&C

June 2009 - February 2010

Project Involved: Revamp Turn Around and Shut Down project, PSR-2 Melaka Oil Refinery -
- Sungai Udang Melaka
Scoop of Work
➢ Responsible to study the revamp standard and procedure as the basis of the project specification and requirements to harmonize work flows and work sequence.

➢ Review drawing, such as P&I Idend G A Plant Drawing, Isometric Drawing or Line Drawing to interpret piping tie-in symbol indicate in the drawing and the identification of the revamp scope

➢ Prepare daily work plant and safety precaution before execution of any activities on site

➢ Carried out piping tagging to assisting line with assistance of plant operation, petronas representative to witness and proved the tagging works done precisely.

➢ Carried out piping tie-in activities such as bolted, welded cold tap/hot tap based on approved tai-in pack.

➢ Mobilized disinvestment pipe spool with mark- up drawing to replace new existing line for (PTA} Pre-turnaround and (TA) Turnaround works.

➢ Executed Revamp piping construction work of (PTA} - Pre-Turnaround and (TA) - Turnaround works.
➢ Submit daily progress report and feet back to project management
CURRICULUM VITAE

Piping Supervisor

STEELCON ENGINEERING

July 2008 - April 2009

Project Involved: PML - Petronas Mega Methanol Project Labuan

Scoop of Work:
➢ Line check and punch list work item both piping and support

➢ Responsible of pipe spools, modification, repair, erection, and installation

➢ Prepared requisition of materials and fittings accessories to warehouse and fabrication shop

➢ Performed line check joint with client representative and closed punch list work item

➢ Attained daily and weekly coordination meeting both petronas and lurgi representative

➢ Responsible of manpower distribution to site erection and modification yard

➢ Prepared and submit daily, weekly, monthly progress report

Structural Sr Supervisor

RB PROJECT RESOURCES

October 2007 - June 2008

Project involved: Kina Bio power 11.5 MW, EFB Power Plant & Seguntur Bioenergy -
- 11.5 MW Biomass Power Plant Sandakan Sabah

Scoop of Work:
➢ Reviews project drawings and specification in relation with formulating effective working procedure and perform quality of work and production

➢ Organized work plant and safety precaution for daily implementation

CORRICULUM VITAE
➢ Maintain record /files of all the necessary document of every activities pertaining to specification design materials dimension and procedures to be carried out at work site

➢ Reviewed and up-date iso-metric drawing to ensured new revision before issued to fabrication

➢ Prepared work schedule plan and check list procedure in accordance with the project Requirement

➢ Responsible of manpower distribution to site erection and modification yard

➢ Ensure that all are correct materials, orientation and dimension before and after during fit/up, both fabrication, modification and erection

➢ Prepared and submit the accomplishment of the Daily productivity progress report to the management department

Piping Supervisor

IKATAN INNOVASI SDN, BHD

October 2006 - October 2007

Project Involved: SPC-Biodiesel GBD-Global Biodiesel( Phase - 1) Lahad Datu Sabah


Scoop of Work:
➢ To implement the quality control standard define in the project plant for piping and welding

➢ Ensure new revision of iso drawing and correct materials used, inspection joint fit-up and check dimension correctly

➢ Conduct fit-up and visual inspection for piping installation and complete weld

➢ Request for NDT etc, ( PT, MT, RT, PWHT and PMIV &HT ) on project as per specification requirement code and standard

➢ Conduct hydro test, air blowing, flushing, hydro jetting

➢ Prepared daily report which include inspection result piping daily report

➢ Review test packages for Q, C clearance and ITR

➢ Perform line check, joint with client representative and closed punch list work item

Structure Supervisor

JIWA HARMONY

July 2005 - July 2006

Project Involved:: Tanjong Bin 3xxx MW Power Plant

Piping Supervisor

SAIBOS AKOGEP SNC

October 2005 - January 2007

Project Involved:: Amenan /Kpono Oil and Gas Export Project Phase 2 Compression Module
( AMP - 2 Topside )

Scoop of Work:
➢ Assigned in Piping Fabrication
➢ Reviewed and up-date iso-metric drawing to ensured new revision before issued to fabrication work shop for implementation
➢ Check Materials Pipe and fitting and others related materials before fit/up ➢ Identify and classified, the materials, pipe spool, fittings before delivered to site for erection and installation
➢ Supervising of work, coordinate with subcontractor
➢ Performed and up-date daily, weekly, monthly, progress report

Piping Supervisor

SAIPEM S.A

July 2004 - August 2005

Project Involved: YV - Yoho Development Project

Scoop of Work:
➢ Engineering works completion procedure, scoop of specification & execution
➢ Performed line check for re-instatement based on P&ID Drawing
➢ Prepared and witness bolt tensioning report based on iso metric drawing
➢ To assist piping field Engineer for checking pipe support for critical line according to piping stress analysis
➢ Prepared Ship Loose Spools for Hook-up based on P&ID Spool list and Iso-metric Drawing

Mechanical Piping Supervisor

Kvainier Process System Asia Pacific SDN, Bhd

January 2004 - June 2004

Project Involved: 1.1- TRENEGY - FPSO 1.2 - Offshore - Talisman Energy for BRA / BRB

Scoop of Work:
➢ Prepared PTW on FPSO Production System and on Module Platform
➢ Conducted Offshore Safety Briefing
➢ Arrange and Assign Crews to their respective areas and provide materials, tools &equipment
➢ Re-instatement of complete and install motor pump machine pipe and fittings
➢ Carried out piping tie-in activities such as bolted, welded cold tap/hot tap based on approved tai-in pack.
➢ Responsible of Erection and installation of pipe spools, Fittings valves, bolt /nuts gaskets

Piping Supervisor

Harta Suma Engineering Sdn, Bhd

June 2003 - November 2003

Project Involved: TNB-Gelugor Combined Cycle Conversion Project

Scoop of Work:
➢ Review and up-date field and Iso-metric drawing before issued for fabrication and erection
➢ Check materials, pipe and fittings in accordance with drawing code standard
➢ Performed line check for punch list work
➢ Supervising of work and coordination with the subcontractor
➢ Prepared progress report, man power report ect.

Mechanical/Piping Supervisor

Alstom

December 2002 - May 2003

Project Involved: Manjung 2100 - MW-Power Station

Scoop of Work:
➢ Responsible of Erection installation and machine set-up valves pipe spool and fittings
➢ Performed daily report for complete set-up joint and installed spools
➢ Performed others duties as assigned by superintendent

Piping Foreman

Petra Resources

June 2002 - July 2002

Project Involved: Offshore Seligi - A Production

➢ Responsible of PTW on Module platform
➢ Responsible of Erection and installation of pipe spools, Fittings valves, bolt /nuts gaskets
➢ Responsible of installation of additional support on pipe
➢ Supervised and responsible for distribution of manpower to the respective assignment for erection team
➢ Performed and up-date daily progress report
➢ Provide daily progress report and feet back to project management

Piping Foreman

Samsung IVE

June 2001 - November 2001

Project Involved: Butanol & Derivative Facilities Kerteh Terenganu

Scoop of Work:
➢ Reviewed and up-date drawing, P&ID, G, A Piping layout & isometric drawing
➢ Arrange crews to their respective assignment and provide tools and materials
➢ Prepared requisition on pipe and fitting to warehouse and fabrication shop
➢ Double check of pipe spools and fittings delivered to site before erection and installation
➢ Prepared daily fit/up report and complete weld on inspection and progress report

Q,C. Piping Welding inspector

TETRACON ENGINEERING

March 2000 - June 2000

00
Project Involved: CUF- Centralized Utilities & facilities gebeng kuantan

Scop of Work
➢ To implement the quality control standard defined in the project for piping and welding
➢ Conduct fit/up and visual inspection
➢ Request NDT etc, PT, MT, RT, PWTH,&HT
➢ Check and evaluate test result and recommend the proper action
➢ Report Weekly and Monthly on inspection progress
➢ Supervised and review test packages document to assure all QA/QC requirement are complete

OTHERS DUTIES AND RESPONSIBILITIES
➢ To implement Project Quality Plan for mechanical/piping construction work
➢ To monitor the piping construction work in accordance with the project quality standard of the company
➢ Check whether materials delivered to site are within the prescribed standard and quality
➢ Verifies and certifies that necessary skills meet those prescribed to work on the project
➢ Prepared work schedule plan and check list procedure in accordance with project Requirement
➢ Maintain record /files of all the necessary document of every activities pertaining to specification design materials dimension and procedures to be carried out at work site
➢ Report to mechanical piping management team all activities of the section and performed others related duties that assigned from time to time
➢ Reviews project drawings and specification in relation with formulating effective working procedure and perform quality of work and production
➢ Attend daily and weekly meeting

Qualifications & Certifications

Science and Mechanical Engineering

UITM University Institute Technology Mara Sabah

UITM KOTA KINABALU SABAH

BSME BACHELOR OF SCIENCE AND MECHANICAL ENGINEERING

Institute Jurutera Malaysia

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Are you sure that you want to leave?