Claim you profile


In order to claim your profile, we need to send an email to the email address you used when you created your SkillPages account. This will contain a unique link to claim your profile. We have sent the email to:

b******a@s*y.com

If you don't have access to this email account then please contact the Bark.com team.

 
Boraluwa - Airport Ground Crew - UK

Luxman Boraluwa

UK

Services

Airport Ground Crew

Summary:

land & engineering surveyor/setting out engineer using EDM,OR Robotic total stations/good driver

Work History

Employment History as a Land & Engineering Surveyor

KSA & Sri Lanka

From February 2012

February 2012 to Date
HDB Engineering ltd
E Manton Construction ltd, UK
Providing Site Engineering services & Control survey net work
Ardenleigh NHS Hospital in Birmingham New Building
Setting out foundation & holding down bolts, control survey net work, r/c frame structural &
Other A to Z Site Engineering services to the site.

Birmingham Gateway Project in Network Rail

November 2012 - January 2013

Providing Site Engineer services
Setting out holding down bolts positions for Martifer Mettalic Constructions

Development Project Stage-11 Phase

Bandaranayaka International Airport Sri Lanka

11
International power business department electric power development Co. LTD
Topographical Survey Stage 1 for feasibility Study on Expansion of
VICTORIYA Major hydro electric power station in Kandy , Sir Lanka
Monitoring & surveying existing tunnels for refurbish & rebuilding

Tamworth QUMS School development Project

Willmott

From July 2010

Providing Site Engineer services, Setting-out Profiles, Drainage line systems, other Setting-out jobs and Surveying & Levelling, r/c frame structural, finishing work & roads

Shrewsbury Music Hall development Project

ISG Regions Ltd

From June 2010

Providing Site Engineer services, Setting-out Steel and other Setting-out jobs, Surveying & Levelling

Topographical Survey

From February 2010

for feasibility Study on Expansion of Beech Hotel projects in North east of
Sri Lanka & setting out engineering

E Manton Construction ltd

From February 2009

UK
Building project
Providing Site Engineer services
Setting out foundation & holding down bolts, r/c frame structural
Roads & steel work with main control checking A to Z on going work

Wright way Construction ltd

July 2009 - November 2009

UK
Warehouse Project in Wolverhampton
Providing Site Engineer services,
Earth work, foundation, reinforcement & setting out holding down bolts
Setting-out Profiles, Drainage line systems, Road work and other Setting-out jobs and Surveying & Levelling. Line up & setting out (vertically & horizontally) pre-cast beams & walls

JV Japan Airport

May 2009 - July 2009

consultants Inc Nippon Koei Co. LTD
Bandaranayaka International Airport Sri Lanka
Topographical Survey
Monitoring & surveying existing runway for extensions
Setting out & Engineering Services to New Taxi Ways & Utility services
Managing & helping for junior engineers & surveyors

Wilson Bowden Developments - Omega Park, UK

May 2008 - October 2008

Providing Site Engineer services, Setting-out Profiles, Drainage line systems, other Setting-out jobs and Surveying & Levelling, finishing work, roads & car park, cable lines & boundary walls, r/c frame structural

Birse Civil Division

March 2008 - May 2008

UK
Piling for River Seven in Telferd /water treatment & civil
Monitoring & surveying existing road & embankment of River Seven for refurbish & rebuilding
Includes Setting out, working on drainage and foundations as well as reading designs and liaising with sub contractors. Working on various projects to include - embankment reinforcing / highway bridge strengthening / road widening (etc).

JV Japan Airport

October 2008 - May 2009

consultants Inc Nippon Koei Co. LTD
Topographical Survey

E Manton Construction ltd

From March 2007

UK
Housing Project
Providing Site Engineer services, Setting-out Profiles, Drainage line systems, other Setting-out jobs and Surveying & Levelling, r/c frame structural, finishing work, roads & car park, cable lines & boundary walls. High-rise building vertical & horizontal control
Line up & setting out (vertically & horizontally) pre-cast beams & walls

Gleeson Building Ltd

August 2007 - November 2007

Building project 6 story apartments, UK
Housing Project
New building project 6 story apartment's in Birmingham City centre. Main survey control network, topo surveying, ground work control, setting out pile positions & foundations.
Line up & setting out (vertically & horizontally) pre-cast beams & walls

Quantum Construction Ltd

June 2007 - August 2007

UK
Major Warehouse Project
New warehouse building project. Earth work, foundation & setting out holding down bolts, r/c frame structural, roads & steel work with main control checking A to Z on going work
Line-up, checking & monitoring steel columns
Line up & setting out (vertically & horizontally) pre-cast beams & walls

J11 to J14 Road Work

February 2007 - March 2007

UK
Providing Site Engineer services, Setting-out Profiles, Drainage line systems, other Setting-out jobs and Surveying & Levelling, co-ordinating setting out works associated with structural steelworks, RC Frame and cladding etc.

Biwater Treatment Ltd

From January 2007

to End of February
Biwater Treatment Ltd, Grendon STW, UK
Water treatment & civil
Providing Site Engineer services, Setting-out Profiles, Drainage line systems, other Setting-out jobs and Surveying & Levelling
Setting out of pile caps, piles, co-ordinating setting out works associated with structural steelworks, RC Frame and cladding etc.

Crosby Home

April 2007 - May 2007

project in Essex Street
Birmingham, 10 storey r/c frame structural, High-rise building vertical & horizontal control
Providing Site Engineer services

Bowmer

From April 2007

Kirkland - Cornbow Shopping Centre Halesowen
Asda Super Store, UK
Setting out of pile caps, piles
Providing Site Engineer services, Setting-out Profiles, Drainage line systems, other Setting-out jobs and Surveying & Levelling
Line-up, checking & monitoring steel columns
Line up & setting out (vertically & horizontally) pre-cast beams & walls

E Manton Construction ltd

November 2006 - December 2006

UK
Housing Project
Providing Site Engineer services, Setting-out Profiles, Drainage line systems, other Setting-out jobs and Surveying & Levelling

May Construction

From start to end, Providing Site Engineer services, Setting-out Profiles, Drainage line systems, setting out of pile caps, piles, other Setting-out jobs and Surveying & Levelling using latest Leica 1205 Robotic surveying instruments, setting out foundation & holding down bolts, r/c frame structural, Line-up, checking & monitoring steel columns
Line up & setting out (vertically & horizontally) pre-cast beams & walls
Includes Setting out, working on drainage and foundations as well as reading designs and liaising with sub contractors. Working on various projects to include - embankment reinforcing / road widening (etc). Managing & helping for junior engineers & surveyors

Manton Construction ltd

January 2006 - April 2006

UK
Housing Project
Providing Site Engineer services, Setting-out Profiles, setting out of pile caps, piles, Drainage line systems, other Setting-out jobs and Surveying & Levelling using latest Leica 1205 Robotic surveying instruments, High-rise building vertical & horizontal control

Thomas Vale Construction plc

March 2005 - January 2006

UK
Housing Project
Providing Site Engineer services, responsibility for major construction projects involving £millions in different divisions. High-rise building vertical & horizontal control. All setting out jobs and setting out of pile caps, piles
Setting out foundation & holding down bolts, r/c frame structural,

Edmund Nuttall Ltd

November 2004 - March 2005

UK
Water treatment & civil
Providing Site Engineer services, Setting-out Profiles, Drainage line systems, other Setting-out jobs and Surveying & Levelling using latest Leica 1205 Robotic surveying instruments in Staple Quarry Landfill Sites

Arena Coventry Laing O'Rourke Construction Ltd

September 2004 - November 2004

UK
Providing Site Engineer services; Kerb lines, Profiles, Drainage line systems, Monitoring, Surveying & Levelling and other Setting-out jobs, Deferent level complex vertical & horizontal control
Line-up, checking & monitoring steel columns
Line up & setting out (vertically & horizontally) pre-cast beams & walls

Thomas Vale Construction Ltd

From August 2004

UK
Providing Site Engineer services to Housing project in Walsall.
Includes Setting out, working on drainage and foundations as well as reading designs and liaising with sub contractors. Working on embankment reinforcing, road widening, setting out foundation & holding down bolts, r/c frame structural, High-rise building vertical & horizontal control

Land & Engineering Surveyor /Setting-Out Engineer for Railways

Network Rails, UK

December 2003 - August 2004

Topographical surveys check and establish survey control stations.
Profiling & monitoring track lines, platform and bridges for P-way designs. Setting out.
Monitoring & surveying existing bridges for new prefabrications

Back to Midland Expressway (BNRR), CAMBBA, UK

October 2003 - December 2003

Providing Site Engineer services
setting out foundation & holding down bolts, r/c frame structural,

Site Engineer/ Engineering Surveyor

Edmund Nuttall Ltd

From September 2003

services to Birmingham International Airport 80's Stands and Runway 15 Exit Taxiway project. Setting-Out, Primary survey controls and Topographical Surveys through

Laing O'Rourke Construction Ltd

February 2003 - August 2003

UK
Providing Site Engineer services to New Selfridges Market project (Bullring) in Birmingham City centre. Deferent level complex vertical & horizontal control
Indoor Setting out work, Surveying & Levelling.

Land & Engineering Surveyor /Setting-Out Engineer

Midland Expressway M6 Toll (BNRR)
CAMBBA Company, UK
Monitoring & surveying existing Rail bridges for new constrictions
Working on the new (M6 Toll) Birmingham Northern Relief Road, reporting directly to the Civil Engineering Consultants for the contract responsibilities include the surveying, Precise monitoring inspection and overall construction to both national and international standards. Tasks include specification of proposed route, dealing with queries from other contractors on site, and installed in compliance with the original specification. Reinstatement of secondary survey control continues along the route. To support the survey teams controlling CBM and PQ pave. All Structures are provided with Primary survey control. As BNRR Survey Department, we required to check various key elements in structures, construction site wide. Checking plinth and bearing installation. For checking Machine control formation trim and CBM laying, picking up Capping as Built Survey and CBM as Built Survey all over the new rote. All structures monitored either once or twice a week, using 3D methods. The post involves liaison with professional bodies and the general public to resolve problems and attending all necessary site meetings during the project.
Setting out, using Total station, working on drainage and foundations as well as reading designs and liaising with sub contractors. Working on various divisions include - embankment reinforcing, bridge strengthening, setting out foundation & holding down bolts, r/c frame structural,
Managing & helping for junior engineers & surveyors

Leica Digital Levels

NA 3003 and Automatic Levels
Trimble GPS equipments
• Wild T2, T16 and T2000 Total Station with GRE 3 Data Collector
• Topcon & Nikon Electronic Total Station's , Automatic & Laser Level equipments
• A variety of Total Station Instruments
• AutoCAD & Programmable Calculators

Land Officer

Registered Licensed Surveyor and leveller/
Setting-Out Engineer, Kandy City Municipal Council, Sri Lanka

Victoria Project in Kandy Sri Lanka-Dam monitoring, water treatment & civil

Operating in my own rights in Private Practice during this period, my role involved carrying out Site Surveying, Levelling, and Topographical Surveys, Geodetic checks and Engineering and Control Surveys for construction and building sites. Other duties included the settlement of land disputes, carrying out inspections and supervision of new and old buildings, monitoring of all new constructions, checking and aligning street routes and involved in all aspects of new survey works in Kandy City. Managing & helping for junior engineers & surveyors

Land Surveyor Party Chief

ARAMCO (Arabian American Oil Company) in Saudi Arabia
Work for the Arabian American Oil Company, my work involved Surveying and Levelling, Setting Out, Topographical Surveys and GPS work on major Civil and Construction Engineering Projects ranging from Oil & Gas Fields, Power Plants, Power Distribution Lines, Roads and Pipelines to carrying out Topographical Surveys, Geodetic, Engineering and Control Surveys for construction sites and buildings.
This post required the ability to work in other countries, coping with new cultures and to work effectively with a multi-national workforce. Includes Setting out, working on drainage and foundations as well as reading designs and liaising with sub contractors.

Surveying & Mapping Science

Career Based Training & Expertise
Trained in the use of a wide range of instrumentation and equipment including:
• Leica Robotic Survey instruments such as Leica 1200,1202,1205, TCRA 1103, TCRA 1102, Leica TC600, Leica TC800 and serious, Geodimeter 600, Geodimeter 600 with Penmap, Sokkia & Topcon new instruments

Registered Land Surveyor and Leveller/ Setting-Out Engineer

Survey Generals Department

Sri Lanka.

Operating mainly in a supervisory, advisory and field working capacity, I was responsible for ensuring all Civil and Heavy Construction Projects were carried out in compliance with strict standards regarding Safety, Quality and that all materials were as specified and "fit for purpose". Duties included Town Surveys, Engineering Surveys, Topographical Surveys and Cadastral Surveys, together with co-ordinating and carrying out Ground Control for Air Surveys and GPS work. Projects worked on include Setting out Roads, Channels, Power and Telephone Lines and major construction contracts.
This role required flexibility, adaptability, leadership skills, motivational techniques, team working and the ability to take responsibility for major construction projects involving millions. The ability to resolve complex problems and situations in a diplomatic and professional manner was crucial to this post.

Qualifications & Certifications

Survey Technician

Institute of Surveying

Is this your profile?

If this is your profile, then you can claim it now and log into your account.

We will need to verify your account and email address before you can log in. To claim your profile now, please use the 'Claim Profile' button below.

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Are you sure that you want to leave?