Highly skilled Construction Superintendent/Manager/Piping, with 33 years of service on Sites, Shipyards, Workshops-Marine, Oil & Gas, Petrochemical, Energy-significant experience on offshore constructions; Strong background in Piping(fabrication, erection, test packs, testing, punch listing, reinstatement, pre commissioning, etc.) Mechanical, Structure, Welding;
Organize, manage, co ordinate, supervise construction activities; Monitor quality, quantity and security of work, performance of direct labor and subcontractors; Identify and implement corrective actions; Monitor progress of construction work through the daily and weekly review meetings; Understanding construction process (flow) in all phases-read and interpret Procedures, Specifications, P & ID, PAD, GA, Execution Drawings, Equipment Installation Drawings, etc.; Liaison with all Production Departments, Engineering, QA & QC; HSES, HR, Procurement, Project Management, Client; Strong leadership for multicultural force-trades, supervisors, engineers- excellent interpersonal communication skills-Awareness of Asian Culture; Follow, develop, implement Standards of Quality, Health, Safety and Environmental Management - Completed Safety Training Program for Supervision-Safety Awareness; Organizational skills, problem solving, decision making, team player, self motivated, capacity to work under pressure, available for more and complex tasks and responsibilities;
PROJECTS: Nexen Petroleum UK Ltd-"PUQ"-Production Unit Quarter, offshore platform, new structure, Jebel Ali, Dubai, UAE; "Well Head"-Process, offshore platform, new structure,
Jebel Ali, Dubai, UAE; Fred Olsen-"Wind Career 2"-self propelled and self elevated barge, new structure, Jebel Ali, Dubai, UAE; Bass Drill Management USA Inc.-"Bass Drill Alpha"-Drilling Tender Barge, new structure, Jebel Ali, Dubai, UAE; Chevron Upstream Brazil- FPASO-FRADE, Conversion Project, Dry Dock, Dubai, UAE; FPSO-FRADE, Top Side Modules, new structure, Jebel Ali, Dubai, UAE;

Work History

Construction Superintendent Piping

Jebel Ali

From October 2013

Construction Superintendent Piping

Nexen Petroleum UK Ltd

February 2013 - October 2013

Client: Nexen Petroleum UK Ltd
Projects: "PUQ"-Production Unit Quarter, offshore platform, new structure;
"Well Head" Process, offshore platform, new structure;
Organize, manage, co ordinate, supervise construction piping activities; Prepare and implement work execution plan; Monitor quality, quantity and security of work, performance of direct labor and subcontractors; Identify and implement corrective actions; Monitor progress of construction through the daily and weekly review meetings; Liaison with all Production Department, Engineering, QA & QC, HSES, HR, Procurement, Project Management, Client; Strong leadership for multicultural force-trades, supervisors, site engineers- excellent interpersonal communication skills-Awareness of Asian Culture;
Follow, develop , implement Company and Client Standards of Quality, Health, Safety & Environmental Management;

Project - "Well Head" Process, offshore platform, new structure

Nexen Petroleum UK Ltd

August 2012 - February 2013

Organize, manage, co-ordinate, supervise construction piping activities for two projects:
"PUQ"-Production Unit Quarter, offshore platform-
12.500 pipe spools-erection, fit up , bolt up, weld up;
8.000 valves-erection, fit up bolt up;
9.000 pipe supports-erection, fit up, weld up, bolt up;
"Well Head"-Process, offshore platform-
2600 pipe spools-erection, fit up, bolt up, weld up;
1300 valves erection, fit up, bolt up;
1500 pipe supports erection, fit up weld up;
12.000.000 man hours without LTI

Liaison

Fred Olsen

November 2011 - July 2012

-Project - "Wind Carrier 2", self propelled and self elevated barge, new structure,
November 2011- July 2012;
Duties:
Organize, manage, coordinate, supervise construction piping activities: erection, installation of pipe spools, pipe supports, valves; test packs, tank testing, spools testing, punch listing, reinstatement, pre commissioning;
Prepare and implement work execution plan as relevant to the construction piping and light structure (pipe supports) activities; Monitor quality, quantity and security of work, performance of direct labor and subcontractors; Identify and implement corrective actions in collaboration with Production and Project Management; Monitor progress of construction work through the daily and weekly review meetings;
Liaison with all Production Departments, Engineering, QA&QC, HSSE, HR, Project Management, Client; -Follow, develop and implement Lamprell and Client Standards of Quality, Health, Safety & Environmental Management;
-"PUQ"=12500 pipe spools-erections, fit up, weld up, bolt up (CS, SS, Super Duplex, Cu-Ni);
9000 pipe supports erection, fit up, weld up; 8000 valves erection, fit up, bolt up(heavy shut down valves, up to 3000 Kg); above 900 test packs tested; 350 pipe fitters(day shift, night shift) plus 60 scaffolders,
20 riggers, 100 pipe welders, above 30 supervisors; 3 office piping engineers plus 4 piping site engineers;
-"Well Head"=2600 pipe spools erection, fit up, weld up, bolt up (CS, SS, Super Duplex, Cu-Ni);
1500 pipe supports erection, fit up, weld up; 1300 valves erection, fit up bolt up(heavy shut down valve, up to 3500 Kg); 250 test packs tested; 100 pipe fitter(day shift, night shift) plus 20 scaffolders, 16 riggers,
10 supervisors, 3 office piping engineers plus one piping site engineer;
-"Wind Career 2"=9000 pipe spools-erection, fit up, weld up, bolt up(CS, SS, Cu-Ni, GRP, etc);
6000 pipe supports-erection, fit up, weld up; 4500 valves fit up, weld up; bolt up; 300 test packs tested;
50 tanks tested; 250 pipe...

Yard Manger

QGM Group LLC

July 2011 - October 2011

Projects - "Heron"barge-refurbishment;Boat Landing-new structures;
LER-new structures; FY Living Quarter-new structure;
Marine Division-repair and maintenance; Yard Development;
Offshore projects;
Duties:
Organize, manage, coordinate, supervise construction activities for Heron Barge-refurbishment project; Boat Landing-new structure project-5 nos.; LER-new structure project - 7 nos.; FY-Living Quarter-new structure--1 nos.; Marine Division-repair and maintenance activities; Offshore projects - prepare, approve schedule, man power, equipment, tools, etc, to be transported offshore; Yard Development;
Coordinate with Projects Management, Client Representative, Client, Engineering, QA & QC, HSES, HR;
Implement and develop a strong safety culture on site for the core workers and supervision, engineers, contractors, sub-contractors, ships crews, etc; Monitor quality, quantity and security of work, performance of direct labor and sub-contractors; Very strong leadership for multicultural force: trades, supervision, site engineers, auxiliary force, subcontractors, etc; Implement and develop daily and weekly Production Meeting , daily and weekly Tool Box, weekly Yard Safety Meeting with attendance of all personnel involved in production activities; Implement and develop daily and weekly housekeeping;
Yard Development with main purpose to gain 50.000, 00sqm to 70.000, 00sqm for the future projects: prefabrication, fabrication, erection of new structures, workshops, dedicated lay down area for materials and a new buildings for offices-(relocation of 50 containers-40 ft and 20 ft; collect and relocate all metal scrap-300 tones; collect and relocate all wooden scrap-500stere(cubic meter); collect and loaded 15 skip containers with garbage; relocate the "Heron "Barge materials, the Leighton Eclipse Barge materials from "LER"area; relocation off materials belongs to completed projects; relocation and rearranging of materials and prefabricated structures belongs to ongoing...

Construction Superintendent (Director-Technical)

Bucharest, Romania

January 2010 - May 2011

Projects - Industrial and Civil Work: "Zentiva"- Medicines Plant, "TNT"- International Courier Company, Coca-Cola Romania(Bucharest, Ploiesti, Timisoara),"Decathlon", "Audi", "Toyota", "Renault", etc
Duties:
Manage, coordinate and supervise construction activities for Industrial and Civil Work-Design, procurement, transportation, fabrication, erection and installation of heavy and light piping, structure, equipment - piping fabrication, welding, rigging, painting, galvanizing, pickling and passivations activities; fabrication, erection, welding of pipe supports and structural supports; equipment erection and installation - post aments, awnings, stairs (fire stairs, outdoor stairs, escape stairs-route) over head passages, podiums, industrial shelving, industrial gates, fencing; Prepare and implement work execution plan; Monitor quality, quantity and security of work, performance of direct labor and subcontractors; Leadership for 150 to 200 people; fabricators, fitters, riggers, welders, painters, scaffolders, alpinists, supervisors, site engineers; Liaison with Client Representative, Client.

Construction Superintendent Piping

Jebel Ali

January 2008 - November 2009

-Client - Bass Drill Management USA Inc
-Project - "Bass Drill Alpha"-Drilling Tender Barge-new structure
-Client - Chevron Upstream Brazil-Represented on site by "SBM-Imodco" Inc. and "SBM Engineering"

Senior Piping Superintendent

"QGM Group"Llc

January 2006 - July 2007

Client: "Thule Drilling" represented on site by "Noble Denton"
Project's: "Thule Power" - Jack up Drilling Rig-repair, refurbishment, upgrading
"Thule Force" - Jack up Drilling Rig-new structure
"Thule Energy"- Jack up Drilling Rig-new structure
Duties:
Organize, manage, coordinate, and supervise construction piping activities: fabrication of pipe spools,
pipe supports, manifolds; erection of pipe spools, pipe supports, manifolds, valves; fit up, bolt up and welding of pipe spools; steel fabrication; penetration holes; modification and repair, rerouting of pipe spools; tank testing, spools testing, test pack's, punch listing, reinstatement, pre commissioning; Prepare and implement work execution plan as relevant to the construction piping activities; Monitor quality, quantity and security of work, performance of direct labor and subcontractors; Identify and implement corrective action in collaboration with Project Management; Monitor Progress of construction work through the daily and weekly review meetings; Liaison with all Production Departments, Engineering, QA & QC, HSSE, HR, Procurement, Project Management, Client Representative; Follow, develop and implement "QGM" and "Noble Denton" Standards of Quality, Health, Safety & Environmental Management.
Three projects with: 10.000 pipe spools fabricated (CS, SS, Duplex, Cu-Ni, GRP-including manifolds);
7.000 pipe spools erected, fitted, welded, bolted; 5.000 pipe supports fabricated, erected, welded; 4.000 valves erected, fitted, bolted, welded; 300 test packs tested, up to 50 tanks tested; 500 pipe fitters plus scaffolders, riggers, welders, supervisors, site piping engineers,

Construction Piping Supervisor

"S.D.E.M Enterprises "SA

April 2004 - October 2005

Client - Government of Algeria,
Project - Gas Plant - new structure
Duties:
Lead, coordinate and supervise construction piping activities: fabrication of pipe spools, pipe lines and pipe supports; erection of pipe spools, pipe lines, pipe supports, valves; Receive and check Execution Drawings, GA, P&ID, and Specifications from Engineering Department; Prepare schedule according with daily, weekly priorities for fabrication, erection activities: on field-pipe lines and supports; Monitor quality, quantity and security of work, performance of direct labor and subcontractors; Daily and weekly production and safety meetings with trades and supervisors; Daily and weekly reports;
Follow and Implement Company and Client representative Safety Rules and Regulations.

Construction Superintendent

"SARM Metal Mob"Srl

From January 2002

Projects in "Daewoo" Shipyard Mangalia,
Duties:
Manage, coordinate and supervise construction activities: fabrication, erection welding of pipe spools, pipe supports, structural supports post aments; erection, alignment and fit up equipment, valves in correct coordination; scaffolding, rigging, painting activities, etc; Prepare and implement work execution plan as relevant to the construction activities; Monitor quality, quantity and security of work, performance of direct labor; Monitor progress of construction work through the daily and weekly review meetings; Liaison with other Production Departments, Engineering, QA & QC, HSSE, HR, Procurement, Project Management, Client Representative; Tool box attendance sheet, time sheet for trades and supervision; Monthly meeting at "SARM Metal Mob"- Bucharest location; Follow, develop and implement "Daewoo" and Client's Safety Rules and Regulations.

Liaison

Upstream Brazil

-Represented on site by "SBM-Imodco" Inc. and "SBM Engineering"
-Project - "FPSO-FRADE"- 7 nos. Top Side Modules: 01-Test / Production Separation; 02-Second Stage Separation; 03-Main Gas Compression A; 04-Main Gas Compression B; 06-Gas Treatment;
11-Power Generations 01; 12-Power Generations 02 -new structures-Jebel Ali, Dubai, UAE

Duties:
Organize, manage, coordinate, supervise construction piping activities: fabrication, erection, installation of pipe spools, pipe supports, valves; test packs, hydro testing, tank testing, punch listing, reinstatement, pre commissioning.
Prepare and implement work execution plan as relevant to the construction piping activities.
Monitor quality, quantity and security of work, performance of direct labor and subcontractors.
Identify and implement corrective actions in collaboration with Production and Project Management.
Monitor progress of construction work through the daily and weekly review meetings.
Liaison with all Production Departments, Engineering, Engineering "SBM", Engineering Dry Dock,
QA & QC, HSSE, HR, Procurement, Project Management, Client.
Follow, develop, and implement Lamprell and Client Standards of Quality, Health, Safety & Environmental Management;
Three projects, with 17.000 pipe spools erected, fitted, bolted, welded(CS, SS, Duplex, Super Duplex, Cu Ni, GRP-1'' to 36", schedule 40 to 160-XXS); above 11.000 pipe supports erected, fitted, welded; 10.000 valves erected, fitted, welded, bolted; near 1.000 test packs tested; 40 tanks tested;
Strong leadership for: 150 + 350 +200 pipe fitters, plus scaffolders, riggers, welders, supervisors, office piping engineers, site piping engineers, dedicated manpower;
Follow, develop, and implement Lamprell, SBM and Chevron Standards of
Quality, Health, Safety & Environmental Management.

Construction Piping Supervisor

"Romvec Industries"- Czech Republic

From November 2000

Client -"Foster Wheeler"
Project - Oil Refinery - new structure
Duties:
First phase I lead, coordinate and supervise activities for fabrication welding of pipe spools and pipe supports, in a dedicated workshop for this project, for all major piping systems on Refinery- from below "0"elevation to "30000'' elevation.
In second phase I lead, coordinate, and supervise activities for erection of pipe spools and pipe supports.
Receive and check Specifications, Execution drawings, GA, P&ID from Engineering Department; Planning and prepare schedule with daily and weekly priorities for fabrication and erection activities; Daily manpower allocation requested by client representative; Daily production meeting with foreman's, pipe fabricators, pipe fitters, welders; Weekly production meeting with client representative; Daily and weekly report for client representative; Tool box attendance sheet, time sheet; Follow, develop and implement Company and Client Standards of Quality, Health, and Safety & Environmental Management.

Manager-Owner

Bucharest

April 1990 - July 2000

of the company
Projects in "2 Mai"and"Daewoo"Shipyards'-
Duties:
Organize, manage, coordinate, supervise construction activities: fabrication, erection, fit up, weld up, bolt up of pipe spools, pipe supports, post-aments, steel structure, manifolds, equipments ;tank testing, spools testing, punch listing, reinstatement; Prepare and implement work execution plan; Monitor quality, quantity and security of work, performance of direct labor; Identify and implement corrective actions in collaboration with Project Management; Monitor progress of construction work through the daily and weekly production meetings; Weekly production meetings with Project Management and Client's representative; Liaison with other Production Departments, Engineering, QA&QC, HSE, Procurement,
Project Managements, Clients Representative; Follow, develop and implement Shipyards and Clients Standards of Quality, Safety, Health & Environmental Management.

Construction Supervisor

Polytechnic Institute, Research and Micro

April 1986 - August 1997

Duties:
Receive and check research paper work and drawings, from Universities and starting fabrication and testing of "Zero" Prototype, followed by fabrication and testing of "First" Prototype. Research and production-construction activities for Robotic, Aeronautic Industry; Interface between research workshop and Mechanical, TCM, Aeronautic, Metallurgical, Chemistry, Hydro-Mechanical Universities, etc.; Training and directing activities for students;

Fitter, Fabricator, Welder, Foreman

October 1980 - March 1986

Duties:
Fabrication of pipe spools, pipe supports and post-aments, heavy and light structure
Erection and fit up of pipe spools, pipe supports, post-aments, valves, equipment for military ships.
Repair, refurbishment, new structures for military ships (piping, structural, mechanical, etc )

Qualifications & Certifications

Project Management Professional

Cambridge Educational Institute, Dubai, UAE

Industrial Management

Polytechnic Institute

Post Graduation-Mechanical

Mechanical

College Industrial No. 1-Mechanical, Shipbuilding, Mangalia, Constanta, Romania

Industrial No.1, Mangalia, Constanta, Romania

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Are you sure that you want to leave?

   
Supported Countries
Choose your country

×