Ali - Quantity Surveyor - Salem, Tamil Nadu, India

Liyakath Ali

Salem, Tamil Nadu, India

Summary

 To Execute the Site work such as Road works &Structure works and calculated quantity as per drawings.
 To Prepare IPC Bills,Running Account Bills in Monthly, updated the Executed Quantities based by BOQ item wise, Bar Charts for Highways Structures and Preparation of Bills, Reconciliation of Materials like Cement, Steel and Used materials such as Pipes, Structural Steel, GSB, WMM, DBM, SDBC,BC Etc..Calculate the Earthwork Quantity.
 Preparing the working drawing such as pipe culverts, slab culverts, minor bridge and retaining wall structure.
 Monitoring the execution of the works in Stage by Stage at site verifications, RFI’s records and also comparing the bar Charts, Etc…..

Services

Quantity Surveyor

Summary:

To Execute the Road works in layer by layer of Sub base Course, base Course,Bituminuos Course layers with maintaining the levels. Executing the Structure works & Conducting the Q.C.Works to pertaining to Lab. To Prepare IPC Bills, Running Account B

Work History

post of Engineer (Billing) Department

M/s.NAPC Limited

From November 2012

in various sites of Road and Drain works.
Name of the packages: (1)Construction of Road in NISSAN Car Factory, Roof water Drains Storm Water drains works, Long Test Track & Short Test Track road work at Oragadam in Kancheepuram District.
: (2)Construction of Plant Roads and Drains, KRISHNAPATNAM ULTRA MEGA POWER PROJECT(KUMPP) in Nellore District, Andhra.
: (3)Construction of Plant Roads and Drains, Green Field Project - JK Tyre & Industries Ltd at Sriperambudur in Kancheepuram District.

post of Engineer (Billing) Department

M/s.NAPC Limited

From November 2012

in various sites of Road and Drain works.
Name of the packages: (1)Construction of Road in NISSAN Car Factory, Roof water Drains Storm Water drains works, Long Test Track & Short Test Track road work at Oragadam in Kancheepuram District.
: (2)Construction of Plant Roads and Drains, KRISHNAPATNAM ULTRA MEGA POWER PROJECT(KUMPP) in Nellore District, Andhra.
: (3)Construction of Plant Roads and Drains, Green Field Project - JK Tyre & Industries Ltd at Sriperambudur in Kancheepuram District.

post of Engineer (Billing) Department

Infrastructure

July 2009 - September 2012

and Projects Ltd., Hyderabad, worked as a post of Engineer (Billing) Department.

post of Engineer (Billing) Department

Infrastructure

July 2009 - September 2012

and Projects Ltd., Hyderabad, worked as a post of Engineer (Billing) Department.

Asst Highway Engineer

M/s.M.V.R.Infrastructure and Toll ways pvt. Ltd., Hyderabad,

September 2007 - June 2009

d) Construction of four lining NHAI project in execute M/s.M.V.R.Infrastructure and Toll ways pvt. Ltd., Hyderabad, worked as a post of Assistant Highway Engineer.
Name of the package: Four lining of Km.207.050 to Km.248.625, NS-2/BOT/TN-02, salem to Namakkal road (NH7)
Consultant: M/s. Span Consultants Pvt. Ltd., New Delhi.
Project length & Cost: 41.575km. / Rs.265.00 Crores.

Consultant

M/s. Stanley Consultants, INC-RITES (JV)

September 2007 - June 2009

d) Construction of four lining NHAI project in execute M/s.M.V.R.Infrastructure and Toll ways pvt. Ltd., Hyderabad, worked as a post of Assistant Highway Engineer.
Name of the package: Four lining of Km.207.050 to Km.248.625, NS-2/BOT/TN-02, salem to Namakkal road (NH7)
Consultant: M/s. Span Consultants Pvt. Ltd., New Delhi.
Project length & Cost: 41.575km. / Rs.265.00 Crores.

Design Construction, Development, Finance

Name

Operation and Maintenance of Four lining of Km.0.000 (Salem) to Km.53.000 (Kumarapalayam), NH47 Road in the State of Tamilnadu.NS-2/BOT/TN-06.

Design Construction, Development, Finance

Name

Operation and Maintenance of Four lining of Km.0.000 (Salem) to Km.53.000 (Kumarapalayam), NH47 Road in the State of Tamilnadu.NS-2/BOT/TN-06.

Post of Assistant Resident Engineer in M

Upgradation / New

February 2006 - August 2007

construction of state highway road works at seoni district in Mathya Pradesh State worked as a Post of Assistant Resident Engineer in M/s. Mukesh & Associates, Salem.

Name of the package: PMGSY - Project (State Highway).

(i) Km. 0/0 to 33/0 Ramgarh to Darbai Road.
(ii) Km. 0/0 to 36/0 Pounar kala to taklakod Road.

Project length & Cost: 69 km. / Rs.90.00 Crores.

f) Worked as a Technical assistant post

National Highway Department

July 2001 - January 2005

Salem (Dt.), Tamilnadu, there executing maintenance & strengthening the existing road works

f) Worked as a Technical assistant post

National Highway Department

July 2001 - January 2005

Salem (Dt.), Tamilnadu, there executing maintenance & strengthening the existing road works

g) Worked as a Technical Assistant post

Tamil Nadu state

July 1998 - June 2001

Period: From July 1998 to June 2001.

g) Worked as a Technical Assistant post in Strengthening the existing road in Tamil Nadu urban Development project division (TNUDP), Coimbatore District, Tamil Nadu state.
Name of the Road: Improvement to the ring road in and around Tirupur road- Package No. II, IV & V at Tirupur
Under worked: Divisional Engineer (Highway), TNUDP, Project division, Coimbatore.

g) Worked as a Technical Assistant post

Tamil Nadu state

July 1998 - June 2001

Period: From July 1998 to June 2001.

g) Worked as a Technical Assistant post in Strengthening the existing road in Tamil Nadu urban Development project division (TNUDP), Coimbatore District, Tamil Nadu state.
Name of the Road: Improvement to the ring road in and around Tirupur road- Package No. II, IV & V at Tirupur
Under worked: Divisional Engineer (Highway), TNUDP, Project division, Coimbatore.

Has

over 24 years experience among which past 18 years professional experienced in National Highways & State Highways Road projects work from 1995 to till now.

(Dt.), as a Site Engineer

corporation (TASCO) & (TNSCC)

July 1995 - June 1998

Period: From July 1995 to June 1998.

h)Construction of Various commercial building & factory building in Tamil Nadu spirit corporation (TASCO) & (TNSCC) Salem (Dt.), as a Site Engineer.

(Dt.), as a Site Engineer

corporation (TASCO) & (TNSCC)

July 1995 - June 1998

Period: From July 1995 to June 1998.

h)Construction of Various commercial building & factory building in Tamil Nadu spirit corporation (TASCO) & (TNSCC) Salem (Dt.), as a Site Engineer.

Bar Charts

June 1989 - June 1995

Period: From June 1989 to June 1995.
Duties and Responsibilities:
➢ To Execute the Road works in layer by layer of Sub base Course, base Course, Bituminuos Course layers with maintaining the levels. Executing the Structure works & Conducting the Q.C.Works to pertaining to Lab.
➢ To Prepare IPC Bills, Running Account Bills in Monthly, updated the Executed Quantities based by BOQ item wise, Bar Charts for Highways Structures and Preparation of Bills, Reconciliation of Materials like Cement, Steel and Used materials such as Pipes, Structural Steel, GSB, WMM, DBM, SDBC, BC Etc..Calculate the Earthwork Quantity.
➢ Maintaining the Registers, RFI Daily, Monthly Summary records and material consumption reports, site measurements records and associated with preparing the sub contractor bills and Labour reports. Preparing Monthly Progress Reports, DPR..
➢ Preparing the working drawing such as pipe culverts, slab culverts, minor bridge and retaining wall structure.
➢ Monitoring the execution of the works in Stage by Stage at site verifications, RFI's records and also comparing the bar Charts, Etc ..

Bar Charts

June 1989 - June 1995

Period: From June 1989 to June 1995.
Duties and Responsibilities:
➢ To Execute the Road works in layer by layer of Sub base Course, base Course, Bituminuos Course layers with maintaining the levels. Executing the Structure works & Conducting the Q.C.Works to pertaining to Lab.
➢ To Prepare IPC Bills, Running Account Bills in Monthly, updated the Executed Quantities based by BOQ item wise, Bar Charts for Highways Structures and Preparation of Bills, Reconciliation of Materials like Cement, Steel and Used materials such as Pipes, Structural Steel, GSB, WMM, DBM, SDBC, BC Etc..Calculate the Earthwork Quantity.
➢ Maintaining the Registers, RFI Daily, Monthly Summary records and material consumption reports, site measurements records and associated with preparing the sub contractor bills and Labour reports. Preparing Monthly Progress Reports, DPR..
➢ Preparing the working drawing such as pipe culverts, slab culverts, minor bridge and retaining wall structure.
➢ Monitoring the execution of the works in Stage by Stage at site verifications, RFI's records and also comparing the bar Charts, Etc ..

Divisional Engineer (NH)

Name of the Road

(ii) Bangalore-Salem-Madurai Road (NH 7)
Under worked with: (i) Km.0/0 to 59/0 (NH68) (ii) Km.199 to 273.500 (NH 7)
Divisional Engineer (NH), Salem.

Divisional Engineer (NH)

Name of the Road

(ii) Bangalore-Salem-Madurai Road (NH 7)
Under worked with: (i) Km.0/0 to 59/0 (NH68) (ii) Km.199 to 273.500 (NH 7)
Divisional Engineer (NH), Salem.

Qualifications & Certifications

GOVT.HIGH SCHOOL,SALEM.

C.S.I.POLYTECHNIC,SALEM

CIVIL ENGINEERING

CSI polytechnic

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Are you sure that you want to leave?