Orcino - Quantity Surveyor - CAS - Quezon, NCR, Philippines

Virgilio Orcino

Quezon, NCR, Philippines

Summary

• Dedicated professional with 24+ years of experience in the field of Civil Engineering works locally and overseas.
• A licensed Civil Engineer; member of the Philippine Institute of Civil Engineers; Inc. (PICE) Manila Chapter.
• Experience spans over various projects like construction of International Airport, Office/Industrial buildings with site development works and Bridge along rural road with approach roads.
• Intensive experience in working at Engineering, Procurement and Construction on large scales project.
• Expertise in quantity surveying/project cost estimation with knowledge in conceptual design and drafting works for Civil, Architectural and Structural.
• Strong organizational skills and a proven ability to overcome challenges, solve complex problems, rapidly develop proficiency with software products and drive projects through to completion.
• Good communication skills and strong team mentoring skills.
• Achievement oriented with an ability to manage change with ease and deliver even under stressful conditions.

Services

Quantity Surveyor - CAS

Summary:

Thirteen years as Quantity Surveyor/Cost Control/Conceptual Design Engineer for the construction of various Office/Industrial Buildings with site development works in Cavite/Laguna, Philippines.

Work History

Quantity Survey Manager

TAV Construction (TAV-ACC T5 JV)

From May 2014

PROJECT INVOLVEMENT:
• KING KHALED INTERNATIONAL AIRPORT TERMINAL 5
Riyadh, Kingdom of Saudi Arabia

The capacity of the airport is 14 Million Passengers/year.

The project scope comprises the following works:
• Total Terminal Design Capacity: 14,000,000 passengers per year
• Terminal Building Area: 10,000 m2
• Car Park Area: 90,000 m2 (3,000 Vehicles Capacity)
• Pier Structure Work: 460 meters
• Passenger Boarding Bridges: 16 Units

RESPONSIBILITIES:
• Assist quantity survey engineers for the preparation of BOQ and checking of claims for clients and sub-contractors prior for payment preparation in coordination with accounting department and monitoring using proper forms and documentation.
• Assists in contractual claims assessment and back charges with the client and subcontractors.
• Participate in project development activities including scope definition and clarification, pre-construction planning, control estimate development and delivery.
• Provide pre-construction services including the preparation of preliminary budgets, cost plans and value engineering opportunities.
• Coordinate, preparation and perform of full detailed quantity take-off estimates, identifying inherent risk and opportunities.
• Time Management – multi-tendering, budgeting, etc.

QUANTITY SURVEYOR

SKY ORYX JV- (TAISEI-TAV)

November 2007 - July 2012

PROJECT INVOLVEMENT:
• NEW DOHA INTERNATIONAL AIRPORT PROJECT (HAMAD INTERNATIONAL AIRPORT)
P.O. Box 55873, Doha State of Qatar

The project has a value of US$ 3,744,417.000. The capacity of the airport is 24 Million Passengers/year.

The project scope comprises the following works:
• Total Terminal Capacity: 48,000,000 passengers per year
• Terminal and Concourses Building Area: 505,000 m2
• Concrete: 280,000 m3
• Rebar: 60,00 ton
• Structural Steel: 80,000 ton
• Gypsum Board Partition: 683,500 m2
• Stone Cladding: 35,000 m2
• Phenolic Panel: 28,500 m2
• Interior Glazing (IG): 47,000 m2
• Ceiling: 282,000 m2
• Floor Finish - Terrazzo: 147,000 m2, Carpet: 84,000 m2, Tiles: 13,600 m2

RESPONSIBILITIES:
• Coordinate with the subcontractors/suppliers on the status of manufacturing, readiness of delivery and documents submittal based on approved plans & specifications.
• Coordinate with QA/QC department with regard to the factory materials inspection prior to dispatch the materials from the origin.
• Estimation / quantity take off and develop BOQ in order to verify and control quantities during execution based on approved plans and specifications.
• Checking and evaluation of subcontractors & suppliers cost proposal based on approved plans & specification and review, prepare the cost comparison against the approved construction budget prior for final negotiation.
• Assists in contractual claims assessment and back charges with the client and subcontractors

QUANTITY SURVEYOR - Engineering Dep't

CCT CONSTRUCTORS CORPORATION

December 1994 - October 2007

PROJECT INVOLVEMENT:
• VARIOUS OFFICE/INDUSTRIAL BUILDINGS with SITE DEVELOPMENT
Cavite/Laguna/Subic Industrial Park, Philippines

The projects has a value ranging from ₱ 1,200,000,000.00 – ₱ 600,000,000.00.

The projects scope comprises the following works:
• Total Manufacturing Employee: 5,000 - 3,000.
• Civil/Architectural/Structural and Electro/Mechanical works
• Site Development works with Peripheral Buildings
• Manufacturing Lot Area: 3 ha. - 1.5 ha.
• Manufacturing Building Floor Area: 30,000 - 15,000 m2
• Concrete: 16,650 - 8,350 m3
• Rebar: 3,750 - 1,900 ton
• Structural Steel: 4,800 - 2,400 ton
• Manpower (At Peak): 1,400 - 700

RESPONSIBILITIES:
• Checking and evaluation of subcontractors and suppliers quotation prior for final negotiation.
• Monitoring of materials and labor costs and updating unit rate of each item of works using proper forms pertaining to construction.
• Evaluation and analyzing Engineering Cost Standards for typical structures prepared by subordinates.
• Preparation and suggestion of Value Engineering and Cost Down study for a particular project.
• Establish and develop unit rate of each item of works based on the prevailing market price and standard productivity rate.
• Provide a full cost engineering, work management, analysis and cost control guidance.
• Follows a cost coding structure and assigns the right cost codes to all purchase requisitions, sub-contractors invoices, supplier invoices, petty cash expenses claims.

PROJECT ENGINEER

TOYO CONSTRUCTION CO., LTD. - Philippine Branch

November 1993 - November 1994

PROJECT INVOLVEMENT:
• CONSTRUCTION of BRIDGE with APPROACH ROADS (Phase IV Group 2) JICA Grant Aide
Barcelona, Sorsogon, Philippines

The project has a value of ₱ 1,000,000,000.00.

The project scope comprises the following works:
• Civil/Architectural/Structural works
• 500m long x 8m width approach roads (both sides)
• 70 meters bridge span a total of 280 meters long (4 spans)
• 12 meters width including sidewalk
• Concrete: 4,000 m3
• Rebar: 600 ton
• Structural Steel: 800 ton
• Manpower (At Peak): 200

RESPONSIBILITIES:
• Supervise the over-all construction of the project for the Construction of Bridges along Rural Roads.
• Evaluation of direct labor based on actual accomplishment and condition of the project.

PROJECT CONTROL

CCT CONSTRUCTORS CORPORATION

November 1992 - October 1993

PROJECT INVOLVEMENT:
• ROHM ELECTRONICS PHILIPPINES, INC. (PHASE II)
PTC-TLRC Compound Carmona, Cavite Philippines

The project has a value of ₱ 400,000,000.00.

The project scope comprises the following works:
• Total Manufacturing Employee: 3,000.
• Civil/Architectural/Structural and Electro/Mechanical works
• Manufacturing Building Floor Area: 10,000 m2
• Concrete: 5,550 m3
• Rebar: 1,250 ton
• Structural Steel: 1,600 ton
• Manpower (At Peak): 500

RESPONSIBILITIES:
• Preparation of project budget in both direct and indirect cost before and during execution of the project.
• Preparation of various plan and corresponding shop drawing for project implementation
• Estimates based on approved quotation, plan and specification in preparation for negotiation with the nominated subcontractors
• Evaluation of subcontractors/suppliers proposal prior to implementation with their respective trade of works
• Evaluation and processing of subcontractors/suppliers billing in coordination with Accounting Department prior to payment preparation and monitoring using proper forms and documentation
• Preparation of weekly and monthly progress report based on actual accomplishment and condition of the project prior for submission of claims to client.

SITE SUPERVISOR

CCT CONSTRUCTORS CORPORATION

September 1990 - October 1992

PROJECT INVOLVEMENT:
• ROHM ELECTRONICS PHILIPPINES, INC. FACTORY (PHASE I)
PTC-TLRC Compound Carmona, Cavite Philippines
• MATSUSHITA (NATIONAL/PANASONIC) FACTORY (PHASE 1)
LTI Sta. Rosa, Laguna Philippines

The projects has a value of ₱ 950,000,000.00 & ₱ 750,000,000.00

The projects scope comprises the following works:
• Total Manufacturing Employee: 4,000 & 3,000
• Civil/Architectural/Structural and Electro/Mechanical works
• Site Development works with Peripheral Buildings
• Manufacturing Lot Area: 2.4 ha. & 1.5 ha.
• Manufacturing Building Floor Area: 32,000 & 25,000 m2
• Concrete: 17,750 m3 & 13,900 m3
• Rebar: 4,000 ton & 3,150 ton
• Structural Steel: 6,400 ton & 5,000 ton
• Manpower (At Peak): 1,450 & 1,120

RESPONSIBILITIES:
• Supervise the construction of the projects for the Construction of Office/Industrial Building.
• Evaluation of direct labor based on actual accomplishment and condition of the project

SITE ENGINEER / ESTIMATOR

L.A. SUMPEROS and ASSOCIATES

April 1988 - August 1990

PROJECT INVOLVEMENT:
• VARIOUS TWO STOREY RESIDENTIAL BUILDINGS with BASEMENT
Ayala Alabang Village, Alabang
Muntinlupa City, Philippines

The project has a value of ₱ 10,800,000.00 – ₱ 5,000,000.00

The project scope comprises the following works:
• Civil/Architectural/Structural and Electro/Mechanical works
• Lot Area: 1,000 - 500 m2
• Floor Area: 450 - 250 m2
• Concrete: 250 - 135 m3
• Rebar: 55 - 30 ton
• Structural Steel: 7 - 5 ton
• Manpower (At Peak): 30 - 20

RESPONSIBILITIES:
• Supervise the over-all construction of the project for the Construction of Residential Building.
• Estimation / quantity take off and develop BOQ in order to verify and control quantities during execution based on approved plans and specifications.

Projects

CONSTRUCTION of BRIDGE ALONG RURAL ROADS (Ph IV Group 2) JICA Grant Aide

October 1993 - September 1994
TOYO CONSTRUCTION CO., LTD – Philippine Branch
4F Princess Building, 104 Esteban Street
Legaspi Village Makati City,1229, Philippines

PROJECT INVOLVEMENT:
• CONSTRUCTION of BRIDGE with APPROACH ROADS (Phase IV Group 2) JICA Grant Aide
Barcelona, Sorsogon, Philippines

The project has a value of ₱ 1,000,000,000.00.

The project scope comprises the following works:
• Civil/Architectural/Structural works
• 500m long x 8m width approach roads (both sides)
• 70 meters bridge span a total of 280 meters long (4 spans)
• 12 meters width including sidewalk
• Concrete: 4,000 m3
• Rebar: 600 ton
• Structural Steel: 800 ton
• Manpower (At Peak): 200

NEW DOHA INTERNATIONAL AIRPORT (HAMAD INTERNATIONAL AIRPORT)

November 2007 - July 2012
SKY ORYX JOINT VENTURE
TAISEI CORP. & TAV TEPE AKFEN JOINT VENTURE
P.O. Box 55873, Doha State of Qatar

PROJECT INVOLVEMENT:
• NEW DOHA INTERNATIONAL AIRPORT PROJECT
PASSENGER TERMINAL COMPLEX CP18
P.O. Box 55873, Doha State of Qatar

The project has a value of US$ 3,744,417.000. The capacity of the airport is 24 Million Passengers/year.

The project scope comprises the following works:
• Total Terminal Capacity: 48,000,000 passengers per year
• Terminal and Concourses Building Area: 505,000 m2
• Check-in Island: 7 (5 Existing + 2 Future)
• Check-on Counters: 160 (CUTE Workstations)
• Elevators: 137 Units
• Escalators: 81 Units
• Travelators: 3000 m (42 Units)
• Baggage Claim Carousels: 11 (9 Normal Size, 2 Oversize)
• Outbound Immigration Desks: 28 Units
• Inbound Immigration Desks: 44 Units
• Passenger Loading Bridges: 72 Units
• No. of Gates: 33 Units
• Security Screening Stations: 42 Units
• Concrete: 280,000 m3
• Rebar: 60,00 ton
• Structural Steel: 80,000 ton
• Gypsum Board Partition: 683,500 m2
• Metal Cladding (Interior): 100,00 m2
• Stone Cladding: 35,000 m2
• Phenolic Panel: 28,500 m2
• Interior Glazing (IG): 47,000 m2
• Ceiling: 282,000 m2
• Floor Finish - Terrazzo: 147,000 m2, Carpet: 84,000 m2, Tiles: 13,600 m2
• Staircases: 140 Nos.
• Manpower (At Peak): 23,000

VARIOUS TWO STOREY RESIDENTIAL BUILDINGS with BASEMENT

April 1988 – August 1990
L. A. SUMPEROS & ASSOCIATES
Rancho Estate Phase III
Marikina, Metro Manila, Philippines

PROJECT INVOLVEMENT:
• MAMBO 640 RESIDENTIAL BUILDING
Ayala Alabang Village, Alabang Muntinlupa City, Philippines
• MR. & MRS. RAFAEL RESIDENCE
Pacific Village, Alabang, Muntinlupa City, Philippines
• MR. & MRS. SANTOS RESIDENCE
BF Homes, Sucat Paranaque, Metro Manila, Philippines

The project has a value of ₱ 10,800,000.00 – ₱ 5,000,000.00

The projects scope comprises the following works:
• Civil/Architectural/Structural and Electro/Mechanical works
• Lot Area: 1,000 - 500 m2
• Floor Area: 450 - 250 m2
• Concrete: 250 - 135 m3
• Rebar: 55 - 30 ton
• Structural Steel: 7 - 5 ton
• Manpower (At Peak): 30 - 20

VARIOUS OFFICE/INDUSTRIAL BUILDINGS with SITE DEVELOPMENT

October 1994 – October 1992
CCT CONSTRUCTORS CORPORATION
3rd Floor Princess Building
104 Esteban Street, Legaspi Village
Makati City 1229, Philippines

PROJECT INVOLVEMENT:
• VARIOUS OFFICE/INDUSTRIAL BUILDINGS with SITE DEVELOPMENT
Cavite/Laguna/Subic Industrial Park, Philippines

The projects has a value ranging from ₱ 1,200,000,000.00 – ₱ 600,000,000.00.

The projects scope comprises the following works:
• Total Manufacturing Employee: 5,000 - 3,000.
• Civil/Architectural/Structural and Electro/Mechanical works
• Site Development works with Peripheral Buildings
• Manufacturing Lot Area: 3 ha. - 1.5 ha.
• Manufacturing Building Floor Area: 30,000 - 15,000 m2
• Concrete: 16,650 - 8,350 m3
• Rebar: 3,750 - 1,900 ton
• Structural Steel: 4,800 - 2,400 ton
• Manpower (At Peak): 1,400 - 700

ROHM ELECTRONICS PHILIPPINES INC. (PHASE II)

October 1992 – September 1993
CCT CONSTRUCTORS CORPORATION
3rd Floor Princess Building
104 Esteban Street, Legaspi Village
Makati City 1229, Philippines

PROJECT INVOLVEMENT:
• ROHM ELECTRONICS PHILIPPINES, INC. (PHASE II)
PTC-TLRC Compound Carmona, Cavite Philippines

The project has a value of ₱ 400,000,000.00.

The project scope comprises the following works:
• Total Manufacturing Employee: 3,000.
• Civil/Architectural/Structural and Electro/Mechanical works
• Manufacturing Building Floor Area: 10,000 m2
• Concrete: 5,550 m3
• Rebar: 1,250 ton
• Structural Steel: 1,600 ton
• Manpower (At Peak): 500

CONSTRUCTION OF BRIDGES ALONG RURAL ROAD (PH IV GROUP 2)

November 1993 – November 1994
TOYO CONSTRUCTION CO., LTD – Philippine Branch
4th Floor Princess Building
104 Esteban Street, Legaspi Village
Makati City 1229


PROJECT INVOLVEMENT:
• Construction of Bridge with Approach Roads
(Phase IV Group 2) JICA Grant Aide
Sorsogon, Philippines

VARIOUS OFFICE/INDUSTRIAL BUILDINGS with SITE DEVELOPMENT

December 1994 – October 2007
CCT CONSTRUCTORS CORPORATION
3rd Floor Princess Building
104 Esteban Street, Legaspi Village
Makati City 1229, Philippines

PROJECT INVOLVEMENT:
• SANKYO SEIKI PHILIPPINE FACTORY
Subic Technopark, SBFZ Philippines 2222
• JUKEN SANGYO PHILIPPINE FACTORY
Subic Technopark, SBFZ Philippines 2222
• SANYO DENKI PHILIPPINE FACTORY
Subic Technopark, SBFZ Philippines 2222
• OMRON MECHATRONICS FACTORY
Subic Technopark, SBFZ, Philippines 2222
• LINDBERG SUBIC FACTORY BUILDING
Subic Technopark, SBFZ, Philippines 2222
• ROHM MECHATECH WASTE WATER TREATMENT PLANT
PTC-TLRC, Carmona, Cavite
• MINOLA VEGETABLE OIL REFINING PLANT
CAIP, Bauan, Batangas
• TECHNOL EIGHT PRESS FACTORY
LTI, Sta. Rosa, Laguna
• KINSEKI ELECTRONICS FACTORY
NCTO, Naga, Cebu
• IRISO ELECTRONICS FACTORY
PEZA, Rosario, Cavite
• PHILACOR MANUFACTURING PLANT
Barangay Maunong, Calamba, Laguna
• ROHM MECHATECH FACTORY EXPANSION
PTC-TLRC, Carmona, Cavite
• MATSUSHITA (NATIONAL/PANASONIC) WAREHOUSE EXPANSION
LTI, Sta.Rosa, Laguna
• STAR MOTORS FACTORY EXPANSION
LTI, Sta.Rosa, Laguna
• UNIVERSAL MOTOR/VOLVO SHOWROOM
Shaw Boulevard, Mandaluyong City
• SEISMOGRAPHIC STATION ( 5 UNITS )
Various locations in Metro Manila
• MATSUSHITA (NATIONAL/PANASONIC) FACTORY (3rd & 4th BUILDING)
LTI Sta. Rosa, Laguna
• ASAHI GLASS PHILIPPINES
Pinagbuhatan Pasig City, Metro Manila
• TOSHIBA INFORMATION EQUIPMENT PHILS. INC.
Laguna Techno Park, Binan Laguna
• TOSHIBA BUILDING 1 & 2 WAREHOUSE EXPANSION
Laguna Techno Park, Binan Laguna

ESTIMATOR - CIVIL / ARCH'L / STRUCTURAL

RESPONSIBILITIES:
• Prepare initial data prior to estimating works of each project for the preparation of budgetary estimates.
• Evaluation of Bid Documents of each project being assigned for estimate.
• Attend Pre-bid Meetings/Conference for incoming projects.
• Coordinates with Designers/Construction Managers for some queries arising involving any project for estimate.
• Attend pre-construction meeting with Clients and Designers
• Instruct drafting personnel to prepare plan and presentation for new quotation.

EXPERIENCES GAINED:
• Study and analyze the estimate for Civil/Architectural/Structural works then finally the overall cost of the project including direct and indirect cost.
• Preparation of breakdown for Site Expenses and Temporary Facilities.
• Checking / Evaluation of suppliers / subcontractors quotation for final negotiation.
• Monitoring / updating of materials and labor costs pertaining to construction.
• Evaluation / Analyzing Engineering Cost Standards for typical structures prepared by subordinates.
• Preparation / suggestion of Value Engineering and Cost Down study for a particular project.

PROJECT INVOLVEMENT:
• SANKYO SEIKI PHILIPPINE FACTORY
Subic Technopark, SBFZ Philippines 2222
• JUKEN SANGYO PHILIPPINE FACTORY
Subic Technopark, SBFZ Philippines 2222
• SANYO DENKI PHILIPPINE FACTORY
Subic Technopark, SBFZ Philippines 2222
• OMRON MECHATRONICS FACTORY
Subic Technopark, SBFZ, Philippines 2222
• LINDBERG SUBIC FACTORY BUILDING
Subic Technopark, SBFZ, Philippines 2222
• ROHM MECHATECH WASTE WATER TREATMENT PLANT
PTC-TLRC, Carmona, Cavite
• MINOLA VEGETABLE OIL REFINING PLANT
CAIP, Bauan, Batangas
• TECHNOL EIGHT PRESS FACTORY
LTI, Sta. Rosa, Laguna
• KINSEKI ELECTRONICS FACTORY
NCTO, Naga, Cebu
• IRISO ELECTRONICS FACTORY
PEZA, Rosario, Cavite
• PHILACOR MANUFACTURING PLANT
Barangay Maunong, Calamba, Laguna
• ROHM MECHATECH FACTORY EXPANSION
PTC-TLRC, Carmona, Cavite
• MATSUSHITA (NATIONAL/PANASONIC) WAREHOUSE EXPANSION
LTI, Sta.Rosa, Laguna
• STAR MOTORS FACTORY EXPANSION
LTI, Sta.Rosa, Laguna
• UNIVERSAL MOTOR/VOLVO SHOWROOM
Shaw Boulevard, Mandaluyong City
• SEISMOGRAPHIC STATION ( 5 UNITS )
Various locations in Metro Manila
• MATSUSHITA (NATIONAL/PANASONIC) FACTORY (3rd & 4th BUILDING)
LTI Sta. Rosa, Laguna
• ASAHI GLASS PHILIPPINES
Pinagbuhatan Pasig City, Metro Manila
• TOSHIBA INFORMATION EQUIPMENT PHILS. INC.
Laguna Techno Park, Binan Laguna
• TOSHIBA BUILDING 1 & 2 WAREHOUSE EXPANSION
Laguna Techno Park, Binan Laguna





November 1993 – November 1994
TOYO CONSTRUCTION CO., LTD – Philippine Branch
4th Floor Princess Building
104 Esteban Street, Legaspi Village
Makati City 1229

PROJECTS UNDERTAKEN:
POSITION: Project Engineer
DURATION: November 1993 – November 1994

RESPONSIBILITIES:
• Supervise the over-all construction of the project for the Construction of Bridges along Rural Roads.

EXPERIENCE GAINED:
• Managing the over-all construction of the project.

PROJECT INVOLVEMENT:
• Construction of Bridges Along Rural Road
(Phase IV Group 2) JICA Grant Aide
Barcelona, Sorsogon, Philippines




September 1990 – October 1993
CCT CONSTRUCTORS CORPORATION
3rd Floor Princess Building
104 Esteban Street, Legaspi Village
Makati City 1229

PROJECTS UNDERTAKEN:
POSITION: Project Control
DURATION: November 1992 – October 1993

RESPONSIBILITIES:
• To assist Project In Charge in all works relative to engineering.
• Coordinate with subcontractors/suppliers on material requirement based on approved plans and specification

EXPERIENCES GAINED:
• Preparation of project budget in both direct and indirect cost before and during execution of the project.
• Preparation of various plan and corresponding shop drawing for project implementation
• Estimates based on approved quotation, plan and specification in preparation for negotiation with the nominated subcontractors
• Evaluation of subcontractors/suppliers proposal prior to implementation with their respective trade of works
• Evaluation and processing of subcontractors/suppliers billing with coordination with Accounting Department prior to payment preparation and monitoring using proper forms and documentation
• Preparation of weekly and monthly progress report based on actual accomplishment and condition of the project

PROJECT INVOLVEMENT:
• ROHM ELECTRONICS PHILIPPINES, INC. (PHASE II)
PTC-TLRC Compound Carmona, Cavite





PROJECTS UNDERTAKEN:
POSITION: Civil Supervisor
DURATION: September 1990 – October 1992

RESPONSIBILITIES:
• Supervise the Civil/Architectural/Structural Works of the project.

EXPERIENCE GAINED:
• Evaluation of direct labor based on actual accomplishment and condition of the project.

PROJECT INVOLVEMENT:
• ROHM ELECTRONICS PHILIPPINES, INC. (PHASE I)
PTC-TLRC Compound Carmona, Cavite
• MATSUSHITA (NATIONAL/PANASONIC) FACTORY (PHASE 1)
LTI Sta. Rosa, Laguna



April 1988 – August 1990
L. A. SUMPEROS & ASSOCIATES
Rancho Estate Phase III
Marikina, Metro Manila

PROJECTS UNDERTAKEN:
POSITION: Field Engineer / Estimator
DURATION: April 1988 – August 1990

RESPONSIBILITIES:
• Supervise the over-all construction of the project for the Construction of Residential Building.

EXPERIENCE GAINED:
• Managing the over-all construction of the project.
• Estimation / quantity take-off of Civil/Architectural/Structural and develop BOQ in order to verify and control quantities during execution based on approved plans and specifications.

PROJECT INVOLVEMENT:
• MAMBO 640 RESIDENTIAL BUILDING
Ayala Alabang Village, Alabang Muntinlupa City
• MR. & MRS. RAFAEL RESIDENCE
Pacific Village, Alabang, Muntinlupa City
• MR. & MRS. SANTOS RESIDENCE
BF Homes, Sucat Paranaque, Metro Manila



EDUCATIONAL BACKGROUND

COLLEGE ---------------------------- University of Pangasinan
Bachelor of Science in Civil Engineering
1980 - 1986

SECONDARY ------------------------ San Clemente, High School
1976 - 1980

PRIMARY ----------------------------- San Clemente Elementary School
1970 - 1976





PERSONAL INFORMATION

Date of Birth ----------------------------- December 07, 1962
Place of Birth ---------------------------- Poblacion Sur, San Clemente, Tarlac
Sex ----------------------------------------- Male
Civil Status ------------------------------- Married
Professions ------------------------------- Registered Civil Engineer
PRC Reg. No. 48243
Computer Literate ---------------------- MS Word, Excel
Skills --------------------------------------- Quantity Surveying/Estimation, Manual Drafting
Height ------------------------------------- 163 cm
Weight ------------------------------------- 60 kg
Religion ------------------------------------ Roman Catholic
Citizenship -------------------------------- Filipino
Qatar Non-Objection Cert. (NOC) – Provided
Passport No. ------------------------------ EB5608691
Issued at ----------------------- PE Doha
Issued on ---------------------- Jun 08, 2012
Expiry Date ------------------- Jun 07, 2017
Availability ------------------------------- Two Weeks After Notice
Previous Salary -------------------------- USD 2,750.00 + Package
Expected Salary ------------------------- USD 4,000.00 + Package (Negotiable)


Special Training / Seminar Taken:
• Construction Productivity Facilitators – Construction Manpower Development Foundation and Japan International Cooperation Agency – 12 March 1996.
• Project and Construction Management – PICE/LNM Continuing Professional Education Program – Oct 30-31, 1997.
• Work at Height Course – May 2010 at NDIA Project Doha, Qatar.



CHARACTER REFERENCES:

• Mr. Masashi Ito
Procurement Manager
Taisei Corporation
CP-18 New Doha International Airport Project
PO Box 55873
Office Tel #: +974 4463 7888

• Ms. Luzviminda Tee
Administration Manager
CCT Constructors Corporation
3rd Floor Princess Building, 104 Esteban Street
Legaspi Village, Makati City, Philippines
Office Tel #: +632 810 2001 to 03





I hereby certify the above information is true and correct to the best of my knowledge and belief.





VERGELIO G. ORCENO

ESTIMATOR - CIVIL / ARCH'L / STRUCTURAL

RESPONSIBILITIES:
• Prepare initial data prior to estimating works of each project for the preparation of budgetary estimates.
• Evaluation of Bid Documents of each project being assigned for estimate.
• Attend Pre-bid Meetings/Conference for incoming projects.
• Coordinates with Designers/Construction Managers for some queries arising involving any project for estimate.
• Attend pre-construction meeting with Clients and Designers
• Instruct drafting personnel to prepare plan and presentation for new quotation.

EXPERIENCES GAINED:
• Study and analyze the estimate for Civil/Architectural/Structural works then finally the overall cost of the project including direct and indirect cost.
• Preparation of breakdown for Site Expenses and Temporary Facilities.
• Checking / Evaluation of suppliers / subcontractors quotation for final negotiation.
• Monitoring / updating of materials and labor costs pertaining to construction.
• Evaluation / Analyzing Engineering Cost Standards for typical structures prepared by subordinates.
• Preparation / suggestion of Value Engineering and Cost Down study for a particular project.

PROJECT INVOLVEMENT:
• SANKYO SEIKI PHILIPPINE FACTORY
Subic Technopark, SBFZ Philippines 2222
• JUKEN SANGYO PHILIPPINE FACTORY
Subic Technopark, SBFZ Philippines 2222
• SANYO DENKI PHILIPPINE FACTORY
Subic Technopark, SBFZ Philippines 2222
• OMRON MECHATRONICS FACTORY
Subic Technopark, SBFZ, Philippines 2222
• LINDBERG SUBIC FACTORY BUILDING
Subic Technopark, SBFZ, Philippines 2222
• ROHM MECHATECH WASTE WATER TREATMENT PLANT
PTC-TLRC, Carmona, Cavite
• MINOLA VEGETABLE OIL REFINING PLANT
CAIP, Bauan, Batangas
• TECHNOL EIGHT PRESS FACTORY
LTI, Sta. Rosa, Laguna
• KINSEKI ELECTRONICS FACTORY
NCTO, Naga, Cebu
• IRISO ELECTRONICS FACTORY
PEZA, Rosario, Cavite
• PHILACOR MANUFACTURING PLANT
Barangay Maunong, Calamba, Laguna
• ROHM MECHATECH FACTORY EXPANSION
PTC-TLRC, Carmona, Cavite
• MATSUSHITA (NATIONAL/PANASONIC) WAREHOUSE EXPANSION
LTI, Sta.Rosa, Laguna
• STAR MOTORS FACTORY EXPANSION
LTI, Sta.Rosa, Laguna
• UNIVERSAL MOTOR/VOLVO SHOWROOM
Shaw Boulevard, Mandaluyong City
• SEISMOGRAPHIC STATION ( 5 UNITS )
Various locations in Metro Manila
• MATSUSHITA (NATIONAL/PANASONIC) FACTORY (3rd & 4th BUILDING)
LTI Sta. Rosa, Laguna
• ASAHI GLASS PHILIPPINES
Pinagbuhatan Pasig City, Metro Manila
• TOSHIBA INFORMATION EQUIPMENT PHILS. INC.
Laguna Techno Park, Binan Laguna
• TOSHIBA BUILDING 1 & 2 WAREHOUSE EXPANSION
Laguna Techno Park, Binan Laguna





November 1993 – November 1994
TOYO CONSTRUCTION CO., LTD – Philippine Branch
4th Floor Princess Building
104 Esteban Street, Legaspi Village
Makati City 1229

PROJECTS UNDERTAKEN:
POSITION: Project Engineer
DURATION: November 1993 – November 1994

RESPONSIBILITIES:
• Supervise the over-all construction of the project for the Construction of Bridges along Rural Roads.

EXPERIENCE GAINED:
• Managing the over-all construction of the project.

PROJECT INVOLVEMENT:
• Construction of Bridges Along Rural Road
(Phase IV Group 2) JICA Grant Aide
Barcelona, Sorsogon, Philippines




September 1990 – October 1993
CCT CONSTRUCTORS CORPORATION
3rd Floor Princess Building
104 Esteban Street, Legaspi Village
Makati City 1229

PROJECTS UNDERTAKEN:
POSITION: Project Control
DURATION: November 1992 – October 1993

RESPONSIBILITIES:
• To assist Project In Charge in all works relative to engineering.
• Coordinate with subcontractors/suppliers on material requirement based on approved plans and specification

EXPERIENCES GAINED:
• Preparation of project budget in both direct and indirect cost before and during execution of the project.
• Preparation of various plan and corresponding shop drawing for project implementation
• Estimates based on approved quotation, plan and specification in preparation for negotiation with the nominated subcontractors
• Evaluation of subcontractors/suppliers proposal prior to implementation with their respective trade of works
• Evaluation and processing of subcontractors/suppliers billing with coordination with Accounting Department prior to payment preparation and monitoring using proper forms and documentation
• Preparation of weekly and monthly progress report based on actual accomplishment and condition of the project

PROJECT INVOLVEMENT:
• ROHM ELECTRONICS PHILIPPINES, INC. (PHASE II)
PTC-TLRC Compound Carmona, Cavite





PROJECTS UNDERTAKEN:
POSITION: Civil Supervisor
DURATION: September 1990 – October 1992

RESPONSIBILITIES:
• Supervise the Civil/Architectural/Structural Works of the project.

EXPERIENCE GAINED:
• Evaluation of direct labor based on actual accomplishment and condition of the project.

PROJECT INVOLVEMENT:
• ROHM ELECTRONICS PHILIPPINES, INC. (PHASE I)
PTC-TLRC Compound Carmona, Cavite
• MATSUSHITA (NATIONAL/PANASONIC) FACTORY (PHASE 1)
LTI Sta. Rosa, Laguna



April 1988 – August 1990
L. A. SUMPEROS & ASSOCIATES
Rancho Estate Phase III
Marikina, Metro Manila

PROJECTS UNDERTAKEN:
POSITION: Field Engineer / Estimator
DURATION: April 1988 – August 1990

RESPONSIBILITIES:
• Supervise the over-all construction of the project for the Construction of Residential Building.

EXPERIENCE GAINED:
• Managing the over-all construction of the project.
• Estimation / quantity take-off of Civil/Architectural/Structural and develop BOQ in order to verify and control quantities during execution based on approved plans and specifications.

PROJECT INVOLVEMENT:
• MAMBO 640 RESIDENTIAL BUILDING
Ayala Alabang Village, Alabang Muntinlupa City
• MR. & MRS. RAFAEL RESIDENCE
Pacific Village, Alabang, Muntinlupa City
• MR. & MRS. SANTOS RESIDENCE
BF Homes, Sucat Paranaque, Metro Manila



EDUCATIONAL BACKGROUND

COLLEGE ---------------------------- University of Pangasinan
Bachelor of Science in Civil Engineering
1980 - 1986

SECONDARY ------------------------ San Clemente, High School
1976 - 1980

PRIMARY ----------------------------- San Clemente Elementary School
1970 - 1976





PERSONAL INFORMATION

Date of Birth ----------------------------- December 07, 1962
Place of Birth ---------------------------- Poblacion Sur, San Clemente, Tarlac
Sex ----------------------------------------- Male
Civil Status ------------------------------- Married
Professions ------------------------------- Registered Civil Engineer
PRC Reg. No. 48243
Computer Literate ---------------------- MS Word, Excel
Skills --------------------------------------- Quantity Surveying/Estimation, Manual Drafting
Height ------------------------------------- 163 cm
Weight ------------------------------------- 60 kg
Religion ------------------------------------ Roman Catholic
Citizenship -------------------------------- Filipino
Qatar Non-Objection Cert. (NOC) – Provided
Passport No. ------------------------------ EB5608691
Issued at ----------------------- PE Doha
Issued on ---------------------- Jun 08, 2012
Expiry Date ------------------- Jun 07, 2017
Availability ------------------------------- Two Weeks After Notice
Previous Salary -------------------------- USD 2,750.00 + Package
Expected Salary ------------------------- USD 4,000.00 + Package (Negotiable)


Special Training / Seminar Taken:
• Construction Productivity Facilitators – Construction Manpower Development Foundation and Japan International Cooperation Agency – 12 March 1996.
• Project and Construction Management – PICE/LNM Continuing Professional Education Program – Oct 30-31, 1997.
• Work at Height Course – May 2010 at NDIA Project Doha, Qatar.



CHARACTER REFERENCES:

• Mr. Masashi Ito
Procurement Manager
Taisei Corporation
CP-18 New Doha International Airport Project
PO Box 55873
Office Tel #: +974 4463 7888

• Ms. Luzviminda Tee
Administration Manager
CCT Constructors Corporation
3rd Floor Princess Building, 104 Esteban Street
Legaspi Village, Makati City, Philippines
Office Tel #: +632 810 2001 to 03





I hereby certify the above information is true and correct to the best of my knowledge and belief.





VERGELIO G. ORCENO

NEW DOHA INTERNATIONAL AIRPORT (NDIA)

November 2007 – July 2012
TAISEI & TAV - SKY ORYX JOINT VENTURE
P.O. Box 55873, Doha
State of Qatar

New Doha International Airport Project
Passenger Terminal Complex (CP-18)
PO Box 55873, Doha
Estate of Qatar

The project has a value of 3,744,417.000 USD. The capacity of the airport is 24 Million Passengers/year.

THE PROJECT SCOPE COMPRISES FOLLOWING WORKS:
• Total Terminal Capacity: 48,000,000 passengers per year
• Terminal and Concourses Building Area: 505,000 m2
• Check-in Island: 7 (5 Existing + 2 Future)
• Check-on Counters: 160 (CUTE Workstations)
• Elevators: 137 Units
• Escalators: 81 Units
• Travelators: 3000 m (42 Units)
• Baggage Claim Carousels: 11 (9 Normal Size, 2 Oversize)
• Outbound Immigration Desks: 28 Units
• Inbound Immigration Desks: 44 Units
• Passenger Loading Bridges: 72 Units
• No. of Gates: 33 Units
• Security Screening Stations: 42 Units
• Concrete: 280,000 m3
• Rebar: 60,00 Ton
• Structural Steel: 80,00 Ton
• Gypsum Board Partition: 683,500 m2
• Metal Cladding (Interior): 100,00 m2
• Stone Cladding: 35,000 m2
• Phenolic Panel: 28,500 m2
• Interior Glazing (IG): 47,000 m2
• Ceiling: 282,000 m2
• Floor Finish - Terrazzo: 147,000 m2, Carpet: 84,000 m2, Tiles: 13,600 m2
• Staircases: 140 Nos.
• Manpower (At Peak): 23,000

Qualifications & Certifications

B.Sc in Civil Engineering

University of Pangasinan, Dagupan City

San Clemente High School

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Are you sure that you want to leave?