Needs - Tunneling / Mining - Bangkok, Thailand

Leigh Needs

Bangkok, Thailand


Hi, to you if you are reading this brief summary, Communication I have found to be a highly important skill that I use in all facets and roles to all personnel I come in contact with from the CEO too my peers and all contractors on site. Being able to pass on knowledge information, praise and many A thank you, has enabled me to achieve many goals and K PI s, that other wise would have been missed.
30 + years working on many varied projects from high speed development mining , narrow vein, large stopes , cave block , sub level, vertical rises, shaft sinking, hydro dam excavation and tunnel development via twin shield TBM as well as road header cutting, all these methods in various ground conditions has given me the skill and incentive to learn about ground support and its importance of using the correct support, testing and re evaluating , combined with using many types of support.

Safety in the work place has played a large part of my supervisory roles and my experience in training and development has had a very positive results for the company , client and miners, as well as great satisfaction for my self.
A team player who can work independently a hands on approach who likes to exceed targets, whilst informing and guiding policy and procedures.
Thinking on the run and sometimes having to think out side the box being a pushy type who is a team player but who can work independently.


Tunneling / Mining


supervisor , delegation of works, cutting , installing lattice girders, bolting, shot crete , grouting , cutting, removing spoil, trucking , explosive use, jumbo , air leg blasting , pre splitting, polymer sealing of water, shaft sinking , shaft fit out, invert setting , concrete pouring, gantry crane, communication., safety implementation, planning, ventilation set up, extraction set up, thrust ring installation, twin shield set up,
Brattice works, wall building, coordination of other contractors, working in team, achieving targets, staying within budgets. fan installation, cable trays, sealant spraying, training.

Work History

Foreman, relief superintendent, supervisor

Ruc Cementation

shaft, ground support, earth works, contract set up

Mining Superintendent


• Jumbo Development

• Level decline & incline

• Long hole stope 140mm holes x50m x50m levels

• Quality assurance and quality control of contractor workforce
• Training local Saudi workforce

• Magazine control & stock taking

• Civil construction, shotcrete

• Ventilation regulators

• ore stockpiles, rom pad development

Mining Advisor

Griffin Mining, China

• Decline level drives & rises

• Contract negotiations, Explosive negotiations with China government

• Long hole training

• Quality assurance and quality control of contractor workforce

• Training local workforce in new mining methods, decline, level and rise mining

• Training local workforce to high level Australian safety practices and standards

• mill dams,

Training Supervisor

African Underground Mining Services

• Training local workforce in stope safety

• Quality assurance and quality control of contractor workforce

• Training local Shift Supervisors and Mine Captains in new mining methods

• Converted mining law to Australian standards

• Jumbo development, 5m x 5m to 30m long hole rises

Mine Superintendent

McConnell Dowell

Instructing locals on mining law, new mining procedures, explosives use and safety and safe shaft sinking

• Shaft 5.5m x 170m shotcrete lined, 2.4m gewi bolts, curtain grouted shaft with 3 rings of 18m depth x
87mm holes (42) sunk inside curtain

• Development of 12m x 12m tunnel x170m head race tunnel

• Hydro Dam wall sinking of 25m x 27m rectangle shaft for water gates

• Pre splitting, explosive face charging, cutting with explosives,

Tunnel Foreman

Thiess John Holland

- Clem 7 Motorway & 6.4km Airport Link

• Supervise 3 crews of 20 men during construction of 2x12m diameter road header tunnels

• Organised safety meetings, walks and talks, planning schedules

• Common ground support methods used: Spiral bars, shotcrete, lattice girders, concrete inverts, canopy
tubes and fibreglass dowels

• 12m diameter TBM set up, thrust rings, invert setting, tail skin, gantry rails, twin shield setup

• Ensuring low ground cover not breached, maintained quality control of cutting and ground support, shot

Underground Shift Supervisor

Byrnecut Mining, Telfer

• Organised shift of 50 men including miners, electrical, service and shotcrete crews

• Responsible for operation of 4 jumbos, 5 boggers and 10 trucks

• Responsible for development of inclines, declines, XC's XS's in cave block, bore fire and rock stabilising with gewi and split set bolts,

• Installing cable bolts in laminated ground, organising placement of sumps and pumps.

• Career highlight: 77 meters of development in one 12hr shift on deck


Roadhouse / Post Office / Alternate Mining

• Prospecting and bulk sampling ore bodies

• Vertical to 70 degrees winze sinking, 30m to 90m depth, explosive and mechanical removal of over burden.

• Establishing roads, drainage, switch backs, moving hills, sumps etc. building and installing retaining

Relief Site Manager / Master Sinker / Shift Supervisor


• Organised shift tasked with sinking 400m concrete lined shaft.

• Brought project in on time under strict project schedule.

• Explosive use in poor ground conditions.

Relief Site Manager / Master Sinker / Shift Supervisor

Byrnecut Mining

• Sites: Stawell, Queenstown, Kanowna Belle, Miitel and Mount Isa

• Shafts typically lined with concrete or shotcreted

• Miitel shaft required use of liquid polymer to seal surrounding ground to achieve dry shaft after sinking inside a cement grout curtain

• Achieved a dry shaft from 22 litres a minute water egress

• Projects included use of super sucker, air track drilling, jumbo shaft sinker

• Stawell shaft had noise restrictions, had to achieve maximum breakage with fewer holes, vibration and displacement restrictions followed.

• Kanowna Belle had two shafts, one vertical, one on 78 degree for CRF filling. Shafts had to intersect at specific depth to achieve client request

• Control of VODS, noise and displacement of fly rock in a large populated area.

• Working in frozen ground, working in high wet bulb conditions.

Underground Shift Supervisor

Eltins, Peabody, Maher Mining

Supervisor responsible for decline, shaft sink, 3mx3m timber set shaft plat and level cutting, rail
development, underlay winze

• Project specific tasks: Standing steel and timber sets for portal, small firing to achieve minimum rock
displacement, rock bolt to water ring installation, operation of single boom jumbo.

• Cutting new portals, installing portal sets, pumping set up, dewatering pits, placement of explosives and blast curtains to minimise fly rock,

Underground Shift Supervisor

Lusang Mining, Indonesia

• Training local workers in safe and current mining method including stope rising and rail driving

• Despite working with a non English speaking crew, I was able to increase their total breakage from 300
tonnes to 800 tonnes per day

• English teaching

Underground Shift Supervisor

Thyssen Mining

• Responsible for supervision of crew during 5 meter diameter, 800 meter deep shaft sinking

• Concrete lined, water ring installation, Training personnel in use of equipment

• Project challenges: laminated ground, split set and CT bolt installation, head frame erection,

Service Crew / Miner / Shaft Sinker / Operator


International Travel 1980 - 1982

Signal Man Trooper / Radio Operator

Australian Department of Defence

Apprentice Boilermaker / Welder

Tomlinson Steel Ltd


brisbane tunnel

worked on 3 parts as foreman, cutting, with road headers, set up twin shield TBM , inverts, grouting sealing of water, ground support, shot crete

Qualifications & Certifications

Armadale / Australia

DIPLOMA health and safety



TEFL Bangkok Thailand

Zhangjiakou University

Skillpages has been acquired by! is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Supported Countries
Choose your country