Gibson - Site Engineer - London, UK

Lee Gibson

London, UK


Fully qualified Site engineer with over 23 years construction experience across Heavy Civil Engineering / Rail / Retail / Residential / Listed Building & Public Sector. Demonstrates a proven track record in delivering projects from start to finish without compromising quality. An excellent work history and a proven track record within the field. Possess the skills and ability to adapt to any new challenges.
Project values £1m -£150m shopping centre The Shires Leicester.


Site Engineer

Work History

Resident Senior Engineer / Site Manager

Buckingham Group Contracting Ltd

January 2012 - January 2012

Buckingham Group Contracting. Network Rail, Northampton (Silver) Re-signalling & Re-control.

Setting out REB’s, Loc Hardstandings, Spt walkways, Helical piles, Grundomat piles, troughing routes , earthing mats & UTX’s. Reviewing Work Package Plans, construction phase plans, task briefings& signing off ITP's, Daily work reports, ordering all materials,allocating work, as built surveys, QA/QC, PDR Meetings, general supervision, site management & tool box talks.

Senior Site Engineer / Project Manager

Amery Construction & Rail Ltd

September 2011 - December 2011

I was responsible for setting out a 40 m Outdoor train wash with concrete apron complete with recycling pump & a 50m Indoor under carriage train wash spanning 2 roads with Mechan engine lift,constructing new OLE base structures, signal bases UTX's, troughing & temporary works reviewing work package plans, construction phase plans, task breifings & signing off ITP's. Daily work reports, ordering all materials, as built surveys, QA/QC, PDR Meetings, general supervision & site management.

Senior Site Engineer / Site Manager


July 2011 - September 2011

At present I am working at Ineos ( ICI ) in Runcorn as a Senior Site Engineer / Site Manager for O'mullane Civil Engineer of Runcorn.
The job itself is installing a 6" high pressure high grade water pipeline for 1.5 miles which includes RC bases bolt boxes & steel stanchions. Daily work reports, setting out, as built surveys, QA QC method statements, risk assesments, permits too dig, tool box talks, general supervision & Site Management.

Senior Site engineer

Morgan Sindall / Northfield construction

June 2011 - July 2011

Manchester Metropolitan University. Art & Design Block
I Set out a 9 storey RC frame Using slip form , plus Lift shaft & groundworks i was responsible for all daily work reports, Tool box talks QA & QC.

Engineering Supervisor

Volker Fitzpatrick

April 2011 - May 2011

Volker Fitzpatrick Stockport. 350Metre Gas pipeline installation.
I was responsible for supervising the instillation of a 350 metre medium pressure gas pipeline,all setting out and measurements daily work reports,QA/QC.

Senior Site Engineer


March 2011 - April 2011

Sainsbury's East Prescot Rd, Liverpool. Car Park Renewal & resurfacing. Setting out car park to new lines and levels including roundabout, new kerbs, retaining wall and all groundworks and all drainage,ready for new tarmac.

Senior site Engineer

Mc Gee / Balfour Beatty

February 2011 - March 2011

Into Newcastle Student Accommodation.
Settingout 9 Storey RC frame student accommodation in Newcastle, also drainage , toolbox talks ,QA &QC & General Site supervision

Site Engineer

ISG Pearce Ltd

June 2010 - June 2010

Freelance Site Engineer for Pearce Construction , in June Setting out for Carpet racetrack in a Best Buy store in Aintree.

Freelance Site Engineer

GCL Construction Birkenhead

January 2010 - June 2010

I was employed by GCL , on a New Build Sainsburys: I was responsible for settingout the carpark too gradients as well as QA/QC & general site supervision.

Senior Settingout Engineer / Supervisor

Maywood Contractors Ltd SandBach.

July 2009 - December 2009

I was working for Maywood Contractors Ltd Settingout Carpark Groundworks & main building on a Lidle Supermarket in Bootle.

Senior Settingout Engineer / Project Manager

Style & Wood

September 2007 - January 2008

Sep 07 – Jan 08 Style & Wood, Tesco’s Crawley Project Cost £5m
Position: Senior Setting out Engineer / Project Manager
• Working on Prestige New Tesco Superstore, Responsible for setting out foundation drainage steel frame and RC, external / internal works,temp works & utilities, QA/QC tool box talks and project management.

Site Engineer

Balfour Beatty Construction

June 2007 - September 2007

June 2007 - September 2007
Company: Balfour Beatty Civil Engineering Ltd

Position: Site Engineer and Sub-Contractors Site Supervisor
Merseyside Cruise Liner Terminal Bridge.
I was taken on as a temporary Site Engineer and was involved in working alongside a Senior Bridge Engineer, for the setting out works required, for the construction of the new link span bridge for the Mersey Cruise Liner Facility Terminal, at the Pier Head in Liverpool City Centre.
My duties and responsibilities included:
· Understanding the technical details of the bridge components and connections from the drawing specifications
· Setting out for the position of the bridge deck supports
· Precision levelling and aligning of the bridgedeckplates
· Setting out for the positions of the steelbridgecolumns
· Assembling and setting out for the pre-fabrication welding of the bridge truss members before being hoisted by crane into position ,· Marking out the fixing positions of the truss members to the steel erectors
· Checking that the bolted and welded connection details had been fixed by the steel erectors in accordance with the specified fixing schedules
In addition to the above I was responsible for directing the daily scheme of activities to the steel erectors, welders and scaffolding workers.

Senior Site Engineer


April 2007 - June 2007

Carrillion, Metrolink GreaterManchester ,
Bury – Altrincham.
Position: Senior Setting out Engineer Project Cost 20m
• Working on several metrolinks new station platform upgrades, as well as P Way track renewals.Work involves the upgrade of platforms, station concourse and a new foot bridge. Over seeing day to day running of the site, organizing sub-contractors, safety (on and off track), environmental matters on a day to day bases, call off & take off of plant & materials and day to day paper work

Senior Site Engineer

Willmott Dixon Construction

January 2007 - April 2007

Wilmot Dixon, Hereford New College of Technology
Position: Senior Setting out Engineer Project cost £ 18m
• Responsible for setting out a 4 storey steel framed & RC structure. I was also responsible for all QA/QC drainage and groundwork’s

Senior Setting out Engineer


October 2006 - January 2007

New Shires Shopping Centre.Leicester, Setting out a 4 storey RC framed shopping centre; I was also reponsible for setting out all the halfens for the glass curtain walling for the complete Buildings, All QC,QA & tool box talks

Setting out Engineer

Bovis/ PC Harrington

August 2006 - October 2006

BT Convention centre- Echo Arena, Kings Dock Liverpool.
Constructing a 10,000 seat RC framed Convention centre & Arena,Including all groundworks & drainage.

Setting out Engineer

Expanded Piling / Lainge O'rourke

March 2006 - August 2006

21 Storey Block of apartments. Princess Dock Liverpool
Setting out Piles for 21 storey block of apartments & also foundations, groundworks & drainage.

Setting out Engineer

Oakapple Construction Leeds

December 2004 - April 2005

Glossop Derbyshire 200 year old Mill conversion into 100 Luxury Flats & Key worker Affordable accomodation
Renovating & Constructing new pad foundations too bulk up existing stanchions,setting out new lift shafts & floor slabs,retaining walls & complete new groundworks drainage QC & QA

Senior Setting out Engineer

Thomas Barnes

September 2004 - December 2004

Middleton Bus Station: I was responsible for all setting out, as builts ,Rfi's , QA/QC , Toolbox talks,ensuring allwork was carried out on time & within health & Safety guidlines.

Senior Site Engineer

Laing O'Rourke

May 2004 - September 2004

Derby City Hospital
I was responsible for junior engineers, checking all setting out, as builts, RFI's, tool box talks,method staments & permits to work, daily work reports etc.

Setting out Engineer

Subcontracting on various Projects in the UK

April 2003 - March 2006

Churngold-Unity building. Cardiff. 21storeys accomodation
Barnfield Construction - Nelson Shopping centre
Wilson Bowden- Manchester Deansgate Luxury flats
Sunnly Turriff- Manchester Arndale shopping centre
Bowmer & Kirkland - Warrington Hazelwood foods & Birkenhead Europa Chambers
Brannigan & West - Liverpool Crown St,Hardman St George Downing Developments
Countryside Properties - Manchester, Luxury Houses, Crewe Site Manager

Site engineer


November 2002 - April 2003

Setting out 4 storey steel framed, RC pad foundations, drainage & brickwork.

Self Employed Site Engineer / Site Agent

Wolfe building Ltd

August 1995 - August 1998

Wolfe Building A
Self Employed Site Engineer / Site Agent Responsible for the general construction of Sefton General Chest clinic, project value £7million.

Assistant Site Engineer


August 1992 - August 1995

Amec Building, Liverpool
Assistant Site Engineer
Working on Liverpool Women’s Hospital project – value £32m
I assisted 2 no Site engineers setting out a 3 Storey RC framed,including daily work reports QA/QC tool box talks & finally working as a finishing foreman, snagg lists etc on over a 1000 rooms.

Assistant Site Engineer

Miller Construction. Rugby England

January 1991 - January 1992

Miller Construction, Rugby/Liverpool
MEPAS-Mersey Estuary Pollution Alleviation Scheme
Assistant Site Engineer - I was responsible for setting out the tunnel boring machines 80 ft under ground, daily surveys, pieso's, daily log's, on a 16 mile section of the River Mersey.

Trainee Building Construction Technician

Norwest Holst

January 1989 - January 1991

Norwest Holst Ltd, Watford / BT research labs Martlesham heath, Ipswich, Suffolk.

I was responsible alongside 2 other engineers for setting out a 3 storey RC framed, Glass curtain walled restaurant & convention centre.


Bovis Lend Lease /Byrnes Bros

January 1988 - January 1989

Bovis/Byrnes Bros Ltd, Watford, Harlequin Shopping Centre 1988 – 1989

Qualifications & Certifications

Btech HNC

Riversdale College Liverpool.

Btech ONC

Suffolk College Ipswich, Suffollk

C.I.O.B>Charterd Institute of Building. First Line Supervisors Certificate

Manchester College of Art & Technology.

Construction Supervisors Safety Module 1

John Ryder Training Centre. Chertsey Surrey.

Is this your profile?

If this is your profile, then you can claim it now and log into your account.

We will need to verify your account and email address before you can log in. To claim your profile now, please use the 'Claim Profile' button below.

Skillpages has been acquired by! is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Lee Gibson provides the following services:

Supported Countries
Choose your country