Gacoski - Senior Mechanical Engineer - Consultant - Karpoš, Macedonia

Kristijan Gacoski

Karpoš, Macedonia

Services

Senior Mechanical Engineer - Consultant

  • Full time
  • Part time
  • One time
  • Contract
  • Temp

Summary:

• Highly accomplished, result-driven Mechanical Engineer with international experience in commissioning and supervisory control of Mechanical Systems, testing of Mechanical assemblies and equipment, and management of projects. Consistent history of improving quality and safety through effective coordination of preventive and predictive maintenance, repairs, and system commissioning. Ensuring compliance with standards.
• B.S. Degree in Mechanical Engineering.
• At the present - Site Construction Manager - Consultant in Fichtner GmbH & Co.KG – Nyakato Site, Mwanza, Tanzania.
• Senior Mechanical Engineer - Consultant and Supervisor for mechanical task in Fichtner GmbH & Co.KG – Nyakato Site, Mwanza, Tanzania.
• Senior Mechanical Engineer - Consultant and Supervisor for mechanical task in Fichtner GmbH & Co.KG – Tufanbeyli Site, Tufanbeyli, Turkey.
• Senior Mechanical Engineer - Consultant and Supervisor for mechanical task in Fichtner GmbH & Co.KG – Ubungo Site, Dar es Salaam, Tanzania.
• More than two years Mechanical Engineer – Consultant and Supervisor for mechanical task in AF-Colenco AG Site office in Skopje, Macedonia.
• More than three years Shear Line Manager in “ArcelorMittal (CRM) & “ArcelorMittal (HRM) – Skopje”.
• More than one year Mechanical Engineer - Plant Manager in Kanar 92 (Former MZT - FAM) – Skopje.
• Excellent knowledge of Microsoft’s Operating Systems and Microsoft Office and Internet.
• Excellent knowledge of professional programs AutoCAD, Mechanical Desktop, Mechanical Power Pack, Mastercam and Proengineer.
• Excellent knowledge and experience working with ASME, ANSI, AWS, NFPA,OSHA, ISO, EN and DIN standards.

Work History

Site Construction Manager - Consultant

Fichtner GmbH & Co.KG - Nyakato Site office, Mwanza, Tanzania

From September 2013

Providing Site Management and Supervision as Owner's representative for Construction of 60MW HFO Power Plant in Nyakato, Mwanza, Tanzania. Responsible for all Site administration, Contract administration and all technical activities in accordance with the drawings, specifications and applicable regulations and standards. Providing technical advisory services for supply, installation, testing and commissioning of 60MW HFO PP. Responsible for the preparation of the MoM on all meetings between Contractor, Client, Consultant and/or other parties. Holding weekly co-ordination meetings at site between key members of the Client /Consultant and the EPC-Contractor.

Project Details:
Owner: TANESCO (Tanzanian Electrical Supply Company) ; Contractor: SEMCO Maritime A/S - Denmark

Nyakato 60MW HFO Power Plant, 10 x 6MW Rolls Royce Diesel Engine B32:40.

Senior Mechanical Engineer - Consultant and Supervisor

Fichtner GmbH & Co.KG - Nyakato Site office, Mwanza, Tanzania

May 2013 - August 2013

Provide Mechanical site supervision at 60MW HFO Power Plant in Mwanza, Tanzania. Supervising, coordinate, advice and control erection and constructions of whole equipment for 60MW HFO PP (Diesel engines, piping, steel structure, tanks, radiators and Balance of Plant). Carried out the contractual QA/QC witnessing as/of OE activities: Witnessing of trial tests (welder tests, NDT tests carried out by third party, high pressure tests, hydro tests etc). Carried out Inspection for compliance with international standards: ASME, ANSI, AWS, NFPA, OSHA, ISO and DIN. Check the equipment for completeness, damages, dimensions and availability of interfaces. Carried out in daily walk downs and inspection for completion and review of punch items and responsible for the preparation of punch list. Conducted reviewing and approval of project documentation, procedure approval, follow up commissioning of all systems for 60MW Nyakato HFO PP. Conducted reviews of the Turn key Contractors O&M manuals. Conducted reviewing and approval of project documentation, procedure approval. Supervising of all Commissioning activities. Supervising Commissioning activities of Rolls Royce B32:40 Engines.

Project Details:
Owner: TANESCO (Tanzanian Electrical Supply Company) ; Contractor: SEMCO Maritime A/S - Denmark

Nyakato 60MW HFO Power Plant, 10 x 6MW Rolls Royce Diesel Engine B32:40.

Senior Mechanical Engineer - Consultant and Supervisor

Fichtner GmbH & Co.KG - Tufanbeyli Site Office, Tufanbeyli, Turkey

August 2012 - February 2013

Provide Mechanical site supervision at 450MW Thermal Power Plant in Tufanbeyli, Turkey. Supervising, coordinate, advice and control erection and constructions of whole equipment for 450MW TPP (Steel structure, boilers, piping and Balance of Plant). Carried out the contractual QA/QC witnessing as/of OE activities: Witnessing of trial tests (welder tests, NDT tests carried out by third party, high pressure tests, hydro tests etc). Carried out Inspection for compliance with international standards: ASME, ANSI, AWS, NFPA, OSHA, ISO and DIN. Check the equipment for completeness, damages, dimensions and availability of interfaces. Carried out in daily walk downs and inspection. Conducted reviewing and approval of project documentation, procedure approval.

Project Details:
Owner: ENERJISA ; Contractor: SK E&C - South Korea

Tufanbeyli 450MW Thermal Power Plant, 3 x 150MW SIEMENS Steam turbines with Lignite Fired.

Senior Mechanical Engineer - Consultant and Supervisor

Fichtner GmbH & Co.KG - Ubungo Site Office, Dar es Salaam, Tanzania

November 2011 - July 2012

Provide Mechanical site supervision at 100MW power plant in Dar es Salaam, Tanzania. Supervising, coordinate, advice and control erection and constructions of whole equipment for 100MW Ubungo PP (Gas Turbines, piping, pumps and Balance of Plant). Carried out the contractual QA/QC witnessing as/of OE activities: Witnessing of trial tests (welder tests, NDT tests carried out by third party, high pressure tests, hydro tests, air compression tests etc), performance tests and certification of crane equipment. Carried out Inspection for compliance with international standards: ASME, ANSI, AWS, NFPA, OSHA, ISO and DIN. Carried out commissioning, test and trial run of the assigned works and their interfaces as per contract. Check the equipment for completeness, damages, dimensions and availability of interfaces. Carried out in daily walk downs and inspection for completion and review of punch items and responsible for the preparation of punch list. Conducted reviewing and approval of project documentation, procedure approval, follow up commissioning of all systems for 100MW Ubungo PP. Conducted Design reviews of the Turn key Contractors O&M manuals. Conducted reviewing and approval of project documentation, procedure approval. Supervising of all Commissioning activities. Supervising Commissioning of Siemens SGT-800 Gas Turbines.

Project Details:
Owner: TANESCO (Tanzanian Electrical Supply Company) ; Contractor: Jacobsen Elektro AS - Norway

Ubungo II 100MW Gas Power Plant, 3 x 35MW SIEMENS SGT-800 Gas turbines with Natural Gas fuel.

Senior Mechanical Engineer - Consultant and Supervisor

AF-Colenco AG - Skopje Site Office, Skopje, Macedonia

April 2009 - October 2011

Provide mechanical Site Supervision at 220MW CCPP Te-To in Skopje, Macedonia. Supervising, coordinate, advice and control of the mechanical erection and constructions of whole equipment for CCPP Te-To (piping, pumps, Gas and Steam -Turbines, HRSG, Steel structure and Balance of Plant). Carry out the contractual QA/QC witnessing as/of OE activities. Witnessing of trial tests (welder tests, NDT tests carried out by third party, high pressure tests, hydro tests, air compression tests etc), performance tests and certification of crane equipment. Reviewing and approval of the Power Plant As-Build documentation. Carried out Inspection for compliance with international standards: ASME, ANSI, AWS, NFPA, OSHA, ISO and DIN. Carried out commissioning, test and trial run of the assigned works and their interfaces as per contract. Check the equipment for completeness, damages, dimensions and availability of interfaces. Carried out in daily walk downs and inspection for completion and review of punch items and responsible for the preparation of punch list. Conducted reviewing and approval of project documentation, procedure approval, follow up commissioning of all systems for 220MW CCPP Te-To. Conducted Design reviews of the Turn key Contractors O&M manuals.

Project Details:
Owner: Te-To ; Contractor: GAMA Power - Turkey

CCPP Te-To 220MW. Combine Cycle Cogeneration Power Plant, Power: 220-240MWel, and 160MWtherm. Gas Turbine ALSTOM GT 13E2 – 180MWel., and Steam Turbine ALSTOM 8CK76 – 160MWtherm. with Natural Gas fuel.

Shear Line Manager

ArcelorMittal Skopje - CRM

February 2006 - April 2009

Management and organization, as well as supervision of all activities for regular function of Shear Line (responsible for 120 persons foreman and workers). Holding daily, weekly, monthly meetings with deputies for delegation of tasks. Preparing production business plan and adequate strategies for its fulfillment, administrative duties and other organizational issues. Preparing consumption budget and implementing it. Organizing and monitoring maintenance of the equipment. Active trouble shooting regarding production equipment. Coordination with all production lines, which are before and after the shear line in order to fulfill the business plan. Preparing programs for cutting and packing of materials. Preparing daily, weekly, monthly and annual reports. Also Deputy Coordinator for implementation of ISO 9001 -2000 Quality System.

Mechanical Engineer ­ Plant Manager

KANAR 92

July 2004 - February 2006

Management and organization of all activities for regular function of Production Plant. Organizing, planning, control and supervision of production. Preparing production business plan and adequate strategies for its fulfillment, administrative duties and other organizational issues. Preparing consumption budget and implementing it. Organizing and monitoring maintenance of the equipment. Active trouble shooting regarding production equipment. Implementation of ISO procedure, construction of mechanical parts, preparing technical drawings in AutoCAD, preparing technology for processing mechanical parts with cutting method with Mazatrol and Mastercam programs.

Qualifications & Certifications

BSc

Univerzitet 'Sv. Kiril i Metódij' vo Skopje

Bachelor of Science Degree

University St. Cyril and Methodius ­ Mechanical Engineering Faculty Skopje

Computer Technician

Rade Jovcevski ­ Korcagin

University St. Cyril and Methodius – Faculty of Mechanical Engineering Skopje Bachelor of Science Degree in Mechanical Engineering (VII/1)

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Kristijan Gacoski provides the following services:


Supported Countries
Choose your country

×