in issip project as team manger as consultant of world bank

Work History

Project manger in ameria - ghosus

From January 2010

project( contractor: moghtar .Ibrahim ) this project contain two culvert with total length 6 km with cost 180 million l.e - now in ISSIP1 project as team leader in associan with Hydroplane ( German office ) work in W.B loan (120 M.USD) AS pm\TA

Senior Q.C Eng in madinaaty project

Talaat Mustafa group

July 2008 - December 2009

it 's one of the famous project (60 milliard L.E) consultant (ECG) on an area 30000 fedan

WWTP Annan

September 2002 - June 2008

in Saudi Arabia
- Supervising the construction of water networks and sewage of the city Qwyeya
- Overseeing the processing WWTP Annan province Qwyeya
- Supervising the construction of water tank Alrain province Qwyey

Senior Q.C Eng

CCC for golden pyramids plaza project in Cairo

September 2000 - September 2002

with J, V Orascom - CCC for golden pyramids plaza project in Cairo.
The project combined the following items:
- 3 Hotels: intercontinental (5 stars)
: Meridian (5stars)
: Holiday Inn Sphinx (4 Stars)
- 8 towers as residential Apartments
- 2 towers furnished Apartment
- Commercial center (the biggest one in the Middle East Area) the project lies on an area of 120000 m2 in Cairo with total cost of 660 million $ the project is under the management of the American consultant Bechtel and supervised by a group of international consultants.

Abutment - locking head


March 1999 - September 2000

3- from 1/3/1999 - 1/9/2000
Working for the J.V of B6-Orascom Q.C Eng for the civil works in EL-ferdan Bridge over Suez Canal where I was responsible for the Quality assurance of the following items:
-reinforced concrete for the following structures: (Abutment - locking head
- Damping head - last sequence of eastern and western pier).
- Protection jetty for the bridge inside the canal ( follow up the pile driving-steel-coating - cages hinges and pile plugs- precast slabs- in situ pouring - placement of fenders - finishing ).
- The bridge is considered as the biggest swing bridge all over the world with total span of 640 MS and total cost of 300 million LE the consultant of the project was ( Hal crow consulting engineering and architects LTD Britain )

montasser co (first class co)

July 1995 - February 1999

- Montasser tower include mall (12 million EG. PT )
- police office club (hotel finishing )

design engineer

December 1993 - June 1995

b) from 1/12/1993 to 30/6/1995 in technical office (studies - tenders - time schedules - following up )
- Payment certificates with the owners and contractors for many projects
c) Arab Germany office (design engineer )

10 Th of Ramadan co

March 1990 - June 1995

for constructing (branch of Arab contractors)
a) from 1/3/1990 to 30/11/1993 in construction department executed (footing Skelton-finishing for many project (zahraa-naser city )

Qualifications & Certifications

civil engineering

Alexandria University