Khaled - Engineer - Cairo, Cairo Governorate, Egypt

Khaled Khaled

Cairo, Cairo Governorate, Egypt



Work History

Senior Site Establishment Engineer - Cairo Region

Technology Department

From August 2008

The effective performance of construction and activation of Base Transceiver Stations
(BTS) and ensuring smooth implementation through direct supervising of all aspects of the roll out phase from acquisition till activation.
▫ Management of the technical acquisition and construction of BTS sites to achieve network superiority for the best of our customer and VF Egypt.
▫ Acquiring new locations.
▫ Signing the contracts of the base stations with the site owners.
▫ Acquiring the building permit from the Municipality.
▫ Acquiring the army permits for the sites.
▫ Monitor the stock levels of Equipment and materials in the warehouse.
▫ Revising the CADs before start construction.
▫ Coordination with Radio and Transmission departments.
▫ Managing Ericsson teams and Huawie in sites activation.
▫ Monitoring the site alarms and make sure the customer is satisfied with the service.
▫ Introducing new initiatives for cost saving and camouflaging solution.
▫ Project Management regarding different Network KPI Streams.

• Cairo Stream Project by 110 %
• 3G Stand Alone by 105 %
• 3G on Live by 125 %

(Sudan) MRO (Mobitel Roll-Out Project - FreeLancer )

MTC Zain (Sudan) MRO (Mobitel Roll-Out

August 2007 - May 2008

Implementation Project coordinator.
Responsible to manage the Telecom Suppliers (ERICSSON, SEIMENS) to achieve Rollout Target during the project period

• Average 1000 On-Air (2G) sites During 7 month.
• Average 200 (3G) on air sites During 7 month.
• Managing up with Ericsson\Siemens the telecom implementation of (Transmission Ring) that has been lunched during the 7 Month Period.

Ericsson Installation Engineer (Transmission and Radio Equipment)


February 2007 - May 2007

(Sierra Leone) / Installation Project Assignment - Africa Region Feb 2007 - May 2007 Ericsson Installation Engineer (Transmission and Radio Equipment).

▫ Installing and commissioning for BTS & Microwave Links sizes (0.6 m, 1.2 m, 1.8 m, and 2.4 m) high
Capacity Links TN.
▫ Installation & Commissioning of Emerson 05ZA hybrid cabinet.

• Succeeded to Over achieve 50 On-Air Radio Sites out of 45 Target.
• Succeeded to Install 31 MW Dishes carrying traffic out 25.


ICT Solution - Cairo / Ericsson Subcontractor / Telecommunication

June 2005 - February 2007

Ericsson Installation Engineer (Transmission and Radio Equipment).

▫ Installation, Commissioning &Testing of Ericsson BTS & Microwave Links
▫ Upgrade Microwave links
▫ Installation & Commissioning of Ericsson DXX (Hub Sites)
▫ Installation & Commissioning of Ericsson ADM (Switches)
▫ Participating in Vodafone modernization Project for 3rd Generation since May 2006 including
▫ Installation of Ericsson ADM in Hub Sites
▫ Installation & Commissioning of Traffic node ( Ericsson high capacity Links)
▫ Installation & Commissioning of Ericsson 3G cabinets Node B (3202, 3206, 3106, 3107, 3308)

• First Engineer to integrate 3G Site in Vodafone Egypt.
• Achieved Vodafone Rollout 2G & 3G Target.

Site Engineer


August 2004 - June 2005

Acquisition, Installation, Preventative Maintenance and Planning.
▫ Projects Scheduling.
▫ Tenders / Bids & Costing Control.
▫ Material Requirements.
▫ Warehouse, Logistics and Procurement Planning.
• Achieved of building average of 40 Rooftop sites out of 37 Sites Target.
• Achieved of building average of 15 Green Field sites out of 12 Sites Target.
• Achieved of building average of 5 Big Micro sites out of 4 Sites Target.

Qualifications & Certifications

Communication Engineering

Arab Academy For Science And Technology

Jersey High School