Hussain - Microtunnelling Operational Manager - Muscat, Oman

Khaja Hussain

Muscat, Oman


Microtunnelling Operational Manager


Independently Managing all concerned overall activities concerned to Microtunelling Operation including documentation and Business devolopment

Work History

Site Manager

Vadnais Microtunnelling LLC

From June 2012

P.O. Box 1556, PC 130, Azaiba, Sultanate of Oman
Tel.: +968 24494156 Fax: +968 24495652
Mobile # 968 99387737

Project Title: MUSCAT WASTE WATER SCHEME PROJECT Contract No 1 & 2
Client: HAYA Water ( & with ACE consultancy
Main Contractor: Gulf Petrochemical services & Trading LLC, Muscat - Oman

Microtunneling Field Operation responsibility includes the following as below.

• Safety procedure is strictly to followed in accordance with
Client specification to till its satisfaction
• Execution of microtunnelling Operation TBM800/1000/1200/1400/1600
concern to planning implementation, and set up including the manpower
& equipment
• Preparing all concerned documentation reports & tools & materials
• Managing resource in an optimum manner, attend all co-ordination
With client & contractor
• Responsible for joint measurements of work done and certification of running bills
• precise execution for Laying Carrier pipes with spiders & filling grout
• Oversee administrative matters of team like work permits,
accommodation etc.

Microtunnelling Sr Engineer

niasauH jjahK

September 2008 - May 2012

Envirox Protection Company Private Limited
4th Floor Sadhana House, 570, Pandurang Budhkar Marg,
Behind Mahindra Towers, Worli, Mumbai -400 018 India
Tell +91-22-6669 3830 Fax: +91-22-6669 3831
Web site:

Project-5: Construction 150 MLD Water Treatment Plant situated at
Netivali Kalyan under client Kalyan Dombivali Municipal Corporation.

• Certifying Billing s of sub-contractors and re consolation of resources of constructional material etc.
• Dealing with Clients & consultants comfortably
• Independent Handling site Execution
• Execution of Flacculater construction , Sedimentation Fillter plant, Cascade
(aerations Fountain , Chlorination chamber etc as per specification of constructional drawing and Client satisfaction along with quality & safety
control management
• Dealing with are concerned departments like i.e traffic police
Telephone, Waterline permission,& road opening etc..

Project-4: BSUP residential project G+8 of 19 nos Buildings at baravey kalian
Under JNNURM Funded project of 63 crore under Client of
Klayan Dombivali Muncipal Corporation

• Independent Handling site Execution of commercial and residential buildings
As per constructional drawing and its specification etc.
• Certifying sub-contractors bills and re consolation of resource etc
• quality & safety control management
• Dealing with are concerned departments like i.e. traffic police
Telephone, Waterline permission,& road opening etc..

Project-3: Condition Assessment of Non-Man entry sewer line from
A ward to E ward of 240 Kms length project cost 12cr

Client: Municipal Corporation of Greater Mumbai
Responsibilities: same as project No 2

Project-2: CCTV survey and Condition assessment Report of existing
Sewer lines 20 kilometer Under Maharastra Jeevan
Pradhikran(Works Division panvel)
& tender cost INR 100, 00,000 completed time 3months
For Modified Khopoli Sewerage Scheme dist, Raigadh
Maharashtra india
Independently project...

Mirotunnelling Engineer


January 2003 - August 2008

Client: Ministry of Municipal Affairs & Agriculture (Drainage Dept) & kharama
Projects in Al-Rayan & Garafa Area Doha - Qatar

1. Surface Water Scheme - Abu Hamour Area
Client: Ministry of water & Electricity (KHRAMA)
Drainage Phase 2, Project No.: CP565/1, MTBM-AVN1600/1000
Project length 1.2km in Metamorphic Rock(Lime Rock) with ground water
Main contractor: Al Waha Co Doha Qatar

2. New Industrial Area Sewerage Project: 675,395/4 & 574
Client: Ministry of water & Electricity (KHRAMA)
Main contractor: HBK CO LTD Doha_Qatar
MTBM AVN 1200/1000/800 in hard rock with ground water
Project length 6.2km in Metamorphic Rock(Lime Rock) with ground water

3. Garrafa_Rayyan Sewerage project No: 451/A
Client: Ministry of water & Electricity (KHRAMA)
Main contractor: AL HUDA CO LTD Doha Qatar
MTBM Avn 1600/1200/1000/800 in hard rock with ground water
Project length 5.8km

4. General Contractor: Konstruktor Engg ( Sub Contractor AJECT)
Client: ASHGAL (Qatar)
Project No: ERC 1400D20/C2 Doha Qatar
MTBM Avn 3000 /2400 /1600 in hard rock with ground water
Project length 2.5km at salwa road

5. Main contractor: Al Jaber Engineering ( Sub Contractor AJECT)
Client: Qatar Petroleum (mesaieed, cornice, raslafan)
Project No: WGI/AJESC.C.S.P.M.
MTBM Avn3000/2400/1200 in sandy ground near sea shore

6. Main contractor: NICC Engineering Co Ltd ( Sub Contractor AJECT)
Client: Ministry of municipal affair & agriculture -Doha Qatar , raslafan)
Project No: ERC 1200 C at Garrfa rayan
MTBM Avn 1600/1200/1000/800 in hard ground under ground water

niasauH jjahK
Work Experience Detail:
• Safety procedure is strictly followed by all concerned in accordance with
International Standards.
• Execution of micro tunneling (Trench less Technology) for Underground Utilities through Herenknect AVN 800 A, B, C & AVN 1000 & 1100, 1200, 2400 till AVN
3000 with the complete setup of sedimentation tanks and installation of separation Plant according to requirement to achieve International...

Civil Site Engineer


January 2000 - December 2002

Mumbai Project Office-India
Client: Municipal Corporation of Greater Mumbai - India

Installation of sewer lines various location in Mumbai by micro tunneling and pipe
jacking method by world bank funded project.

Micro tunneling for a sewerage disposal project at various location in Mumbai with a
various diameter of sewer by AVN 800, 1000, 1200 TC, ISEKI 1600 and AVND
2000/2400 and AVND 3000 with complete setting sedimentation system of tanks.

General supervision of Civil work and pre-casting of pipe through a vertical pouring of concrete pre fabrication of as steel frames for pipe jacking and receiving pits
scheduling of manpower and equipment dealing with the infrastructure departments like (water pipe line, telephone lines, electrical lines, gas and oil lines etc.).
And also traffic police formalities and documentation, preparation of weekly reports
dealing with sub contractors client, consultants, execution of deep excavation with help of sheet piling and surveying for an alignment of a sewer line according to GPR
(Ground Profile Reports) with the clients and consultants and laying of HDPE Carrier
pipe and grouting through out the pipe line as per mentioned specification and drawings and its maintenance.

Civil Site Engineer/QA-QC inspector

NATEL - Saudi Arabia

February 1996 - December 1999

Client/Contractor: Lucent technology International/Saudi Telecom Company
Consultant: Norconsult S.A (NSA).
Quality Control and Quality Department
niasauH jjahK
Project: TEP-6 386/STC, TEp-6/GSM-500K, TEP-6/DMW

Worked as Civil Site Engineer/QA-QC Inspector. The extent of responsibility is to supervise the civil works and antenna mounts fabrication and its installation as per
assumpth angel.

Inspection and testing of activities to confirmation specified requirements according to the approved STC's drawing and its specification as per provisional agreements signed at MOMRA (Ministry of Municipal and rural Authority ) on 29 the May 1984 applicable
only to those areas with no existing serviced. All those plants and systematic action
necessary to provide adequate confidence that service with satisfy given requirements for quality. The operational techniques and activities that used to fulfill requirements.

Civil Engineer

DK Chauhan & Brothers Andheri

June 1995 - January 1996

Mumbai - India
Project: Const. of Commercial and Residential Buildings (G+6)Andheri , Mumbai
General Supervision work for the construction of commercial and residential of
MHADA buildings including the following;
• Scheduling of job activities
• Handling of all construction records
• Arranging of material and equipment
• Dealing with sub contractors and clients
• Preparing weekly reports

Civil Engineer

Parle (E)

June 1993 - May 1995

Project: Residential Building & Highway Construction

As a site engineer executed the construction work according to the drawing and its
specification for residential and main highway in Mumbai. My duties and responsibilities in highway construction include profile surveying, fixing of camber and
super elevation, quantity take off.

Qualifications & Certifications