manage the electrical/instrumentation installation activities on primary, secondary and tertiary crushers,conveyors, ball mills, thickeners, leach tanks, oxygen trains, liquid pertrolium plants, air compressors, and other mining and oil and gas installation activities.

Work History

Safety Officers and QC

Group Five Construction

November 2012 - December 2013

November 2012 -December 2013.
Responsibilities, Take off for all materials for the Akyem Gold project in Ghana. Interview of work force that meet client requirements, erect Site Establishments, attend kick off meetings with the client ( Lycopodium), have internal meetings with Supervisors, Safety Officers and QC department and Document Control. Group Five E/I was responsible for wiring of Substation buildings, installation of MCC, UPS, Remote VSD panels, Ladder rack installation inside substation and Lighting and Small Power. Transformer installation and all cables.
All primary and secondary racking to field equipment, lighting and small power, cables from substation to field equipment, including terminations, instrument installation as per approved hook up. Attend progress and safety meetings. Because I was managing the project it was my responsibilities to see that supervisors manage their work force properly and safety was adhered at all times. Toolbox talks were held every Friday to make sure that safety was all ways maintained.
Quality was of a high standard and all QC packs were submitted on time. The Client was also happy to see me in the field and giving supervisors advice and support.
Although I managed the project I am very much a person that spends a lot of time in the field to see that things get done right the first time. It was also my responsibility to review the monthly certificate for invoice.

Electrical/Instrumentation Site Manager


June 2012 - October 2012

C2 Recovery from natural gas. Sasol 1 and 2.
Responsibilities were the same as on the above project only that the safety was much more stricter because the project was in a classified area. Safety watches were present where all hot work was performed.

Electrical/ Instrumentation Superintendent

Aveng Grinaker LTA

February 1991 - April 2012

Projects. Wax 3 Sasol 3.
Langer Heinrich Uranium. Swakopmund Namibia.
Skorpion Zink. Rosh Pinah Namibia.
AL Ruwais UAE.
Jwaneng Gold Mine Botswana.
Hexene 3 Sasol 3 Secunda.
Mozel Smelter Mozambique.
Rasimone Platinum mine Rustenburg.
Saldanha Steel Sadanha Bay.
Orapa Diamond recovery Botswana.
Oxygen upgrade Sasol 3 Secunda.
Columbus steel Middleburg.
Namaqwa Sands Brand se baai.
Mossgas Mosselbay.
On all the above projects with Aveng Grinaker LTA I was employed as a site supervisor and my responsibilities were the same as with the previous two companies, therefore my field experience has all ways been my success and therefore I can be of great assistance to your company.
The installation of all Electrical and Instrumentation systems including commissioning of electrical equipment has been my strong point.

Qualifications & Certifications

Mathematics, Applied Sience, Trade Theory, Technical Drawings

Athlone Technical Colledge

Noorde Paarl High

Skillpages has been acquired by! is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Kevin Crouch provides the following services:

Supported Countries
Choose your country