Claim you profile


In order to claim your profile, we need to send an email to the email address you used when you created your SkillPages account. This will contain a unique link to claim your profile. We have sent the email to:

k******3@h*****l.com

If you don't have access to this email account then please contact the Bark.com team.

 
Smith - Pipe Fitter - South Shields, South Tyneside, UK

Kenneth Smith

South Shields, South Tyneside, UK

Services

Pipe Fitter

  • Full time
  • Part time
  • One time
  • Contract
  • Temp

Work History

Instrument Pipefitter

RULLION BUILD LTD

December 2012 - January 2013

3 Wk. contract over Xmas and New Year Instrument Pipefitter Contracted to Worldwide Oilfield Vargo
Fabricate, bending and erecting 8mm, 10mm and 12mm banks of instrument pipework on skids for Offshore Emergency shutdowns

INSTRUMENT PIPEFITTER/MECHANICAL .CENTRICA, NORTH MORCOMBE BAY

ATLANTIC RESOURCES

August 2012 - November 2012

INSTRUMENT PIPEFITTER FORTIES DELTA NORTH SEA

STORK TECHNICAL SERVICES

April 2012 - July 2012

Construction & erection of 40m/m Unistrut supports for the installation of replacement Versa Air Valves & solenoids and repipe all in ¼" 3/8" and 1/2"

PIPEFITTER/MECHANICAL

EAST BRAE NORTH SEA

August 2011 - April 2012

Construction of new Pipework for Devenick Module project 0n East Brae, Fabricating and Erecting large Bore 10", 12"24"chrome moly and small Bore ¼" stainless pipe, screwed pipe 1", 2"and 4"

INSTRUMENT PIPEFITTER

PRIMETIME

March 2011 - July 2011

Siemens Oil and Gas Turbines (Lincoln UK)Fabricating, bending and Installing Instrument Pipework to newly built Turbines for worldwide contracts

HP Units

"carbon steel pipes also 10m/m and 25m/m instrument pipework, HP Units, 9/16" Autoclave Pipework.

PIPEFITTER

AMEC OIL & GAS

December 2010 - January 2011

SHELL Oil Rig Platform Nelson and Conoco Philips Platform Britannia Installing flow lines, Hydraulic lines, and Hoses to the Wellhead Valves, also working on various pipe work fabrication and construction installation

PIPEFITTER

WOODGROUP ENGINEERING OFFSHORE

October 2010 - November 2010

2 Trips Offshore on North Cormorant and Cormorant Alpha working from Shutdown Work packs Involving Modification to pipework and removing valves overhauling valves 1" to 18" and reinstalling.

ATLANTIC RESOURCES

September 2010 - September 2010

MECH/PIPING
Offshore Forties Charlie, Shutdown Removal of Pig launcher and Destruct of redundant Pipework and valves and replace with new Pipework and Pig launcher and Valves that we Overhauled.

Pipefitter

AMEC OIL & GAS

October 2009 - August 2010

Offshore Brent Field Construction and erection of Gas Tight floor down the Leg, Installation of new Pipework Large and small bore also instrument pipework, FLUSHING, HIGH AND LOW Pressure testing, chemical cleaning, and Installing Pipe Hangers.

Pipefitter

AMEC GROUP

August 2009 - September 2009

Offshore shutdown Shell Platform Shearwater, Installation of Pipework 24", 18", 16", 8", 6", 2", also 6m/m, 8m/m instrument pipework, Flushing, Test Inspection, and prep work Pressure testing reinstating, final inspection

PIPEFITTER/INSPECTOR. - BP OCTIP PROJECT

PRODUCTION SERVICES NETWORK

February 2009 - June 2009

Construction of compression and terminals integration project, small and large bore pipe work installation. Inspection of installation, formulating outstanding work lists as required.

FIELD ENGINEER - Takuma New Lakeside Waste to Energy Plant Colnbrook

FABRICOM SUEZ LTD

March 2008 - December 2010

Responsibilities included working with client analysing installation issues and highlighting additional work to contract. Raising technical queries as required. Revise isometric and GA drawings updating as required. Ensure supervisors received relevant documentation and aware of clients TQ response. Draw isometrics, red line drawing changes when required. Instruct and oversee fabrication and installation procedures. Assist supervision.

PIPEFITTER

SHAW Group UK LTD

November 2007 - March 2008

installation to work packs. Isometrics and GA drawings. 1"-36" Installations carbon and stainless steel. Wilton Chemical Plant (Teesside ) Pipe work

PIPING SUPERVISOR

ACCEPT (AGY)

September 2007 - November 2007

Contracting to Mechanical Installation International (M I I wales )
Supervised minor pipe work installation. Incinerator and power plant Slough London.

OHARE ENG

Lindsey Oil Refinery

September 2007 - September 2007

(South & East )
PIPEFITTING INSPECTOR - Lindsey Oil Refinery 10day Shutdown.
Ensured installation carried out to specifications and drawings. Formulated snagging/punch lists. Inspected and signed off as and when completed. Issued documentation to client.

PIPEFITTER

FABRICOM CONTRACTING LTD

September 2007 - September 2014

Bacton Gas Terminal 14day Shutdown
Removed and renewed pipe work to drawings, tested installations ensuring work finalised.

PIPING SUPERVISOR

Various Contracts

November 2006 - August 2007

Travelling from site to site sketching new future pipe work. Supervising fabrication and

Is this your profile?

If this is your profile, then you can claim it now and log into your account.

We will need to verify your account and email address before you can log in. To claim your profile now, please use the 'Claim Profile' button below.

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Kenneth Smith provides the following services:


Supported Countries
Choose your country

×