m - Electrical Maintenance Man - Bholav, Bharuch, Gujarat, India

Karthik m

Bholav, Bharuch, Gujarat, India

Services

Electrical Maintenance Man

Work History

Electrical & Instrumentation Engineer-(Maintenance WTP/RO PLANT)

PERMATECH ENGINEERS

From March 2010

CHENNAI. TAMILNADU.

Time Since: MARCH 2010 to TILL DATE.
Designation: Electrical & Instrumentation Engineer-(Maintenance WTP/RO PLANT). Job Responsibility: Supervising electrical cable lying from motors to panels.Instruct
Technician to give power connection to motors, PLC panel and
Field Instruments.
JOB SITE: Adhitya Birla copper, Dahej, Gujarat.
Working under the contract of NALCO WATER INDIA LTD.
PROJECT: Completed my Raw Water Treatment project in Srilanka 80CUM/HR
Capacity.The project is semi automated by using OMRON PLC.

DURATION JULY 2010 to SEP 2010.


Employed in TNEB GAS POWER PLANT (107 MW), KOVILKALLAPAL,
TAMILNADU.

Instrumentation Engineer-(Erection and Commissioning)

Time Since

March 2009 - March 2010

Job Responsibility: Supervising the Instrument Cable Trays and Conduits and Cable Lying
Field instruments installation, instrument side cable termination,
Panel side termination, tubing, impulse piping carrying out Loop
Checking Signal testing, Commissioning of all supplied instruments.


Employed in BROTHERS ENGINEERING & ERECTORS LIMITED, CHENNAI.

Instrumentation Engineer-(Erection and Commissioning)

Time Since

January 2007 - December 2008

Job Responsibility: Supervising the Instrument Cable Trays and Conduits and Cable Lying
Field instruments installation, instrument side cable termination,
Panel side termination, tubing, impulse piping carrying out Loop
Checking Signal testing, Commissioning of all supplied instruments.


PROJECT HANDLED:
PROJECT - I
Title: Conveyor Belt Assembly,
Environ ment: PLC (Omron),
Description: The project developed for controlling
Conveyor belt assembly using control panel. It has operated in two modes such as manual and automatic modes.In this
assembly various sensors like proximity sensors are used with control panel board.This sensors helps to detect the movements of elements and send information to the control panel which
helps to activate the belt assembly.


PROJECT - II
Title: Pin Inserting machine.
Environ ment: PLC (Twido)
Description: The project developed for controlling pin inserting
machine using control panel.This arrangement helps and worked under two modes.This assembly consist of three main


proximity sensors connected with various sub assemblies of inserting tool.It has three tools helps to balance the element in
correct position.The centre tool consist of needle used to insert the pin in right position.

Qualifications & Certifications

ELECTRONICS AND INSTRUMENTATION

ANNAMALAI UNIVERSITY

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Karthik m provides the following services:


Supported Countries
Choose your country

×