Abdul Aziz - CAD Drafter - 43300 Seri Kembangan, Selangor, Malaysia

Kamarul Ariffin Abdul Aziz

43300 Seri Kembangan, Selangor, Malaysia

Services

CAD Drafter

Summary:

SUMMARY
•Kamarul Ariffin has more than (6) years’ experience in drafting of Piping, Mechanical, Process and Structural drawings for oil and gas industry. Also have experience working with oil and gas engineering consultant, fabricator and contractor.
•To responsibilities have includes engineering works from drafting and designs for offshore and onshore projects. Familiar with several technical/analysis software such AutoCAD and PDMS.

Work History

Technical & Engineering Draughtsman

SapuraAcergy Sdn. Bhd. (Seri Kembangan)

From December 2012

Scope of work:
• Prepare technical drawing for Transportation & Installation of Offshore Pipelines, Risers and Facilities.
• Prepare drawings and sketches projects or tenders.
• Prepare story board of hatch cover removal at FPS module lower deck.
• Prepare structural drawings and detail drawings of Sea-fastening of equipment’s at FPS module lower deck.
• Prepare load chart for bidding or tender project.
• Prepare structural drawings and detail drawings including Hang-off Platform, Hammer Deployment Winch Frame, A-frame, and etc.
• Prepare structural drawings and detail drawings of Sea-fastening of Ground Chain, Wire Reels, Manifolds and Anode Rings.
• Prepare structural drawings and detail drawings of Rigging System for Manifolds, Clump weights, a frame, etc.
• Prepare structural drawings and detail drawings for Air Float Route layout at FPS.
• Updating drawings according to Engineer’s comment.
• Prepare Material Take off List projects or tenders.
Projects Involved:
• Gumusut-Kakap (Transportation & Installation of Offshore Pipelines, Risers And Facilities)
Client: SABAH SHELL PETROLEUM COMPANY Ltd. (SSPC)

Mechanical / Piping Draftsman

Perunding Ranhill Worley Sdn. Bhd. (Kuantan)

December 2011 - December 2012

Scope of work:
• Produce and incorporate pipe support details (PSD) and bill of materials BOM and MTO.
• Update equipment layout.
• Produce and update Piping Plan (GA), Pipe Support Location Plan (PSL), Key Plan, Piping Layout Plan and Piping Isometric drawing.
• Produce and update process P&ID drawing.
• Assist designer in incorporating mark-ups to make sure that all drawings are ac-complished with the company standard design and practice.
Projects Involved:
• Sepangar Bay LPG Bottling Plant.
Client: PETRONAS DAGANGAN BERHAD
• Detail Design for PETRONAS GPFM Railway Crossing.
Client: SOUTH PACIFIC CHEMICALS INDUSTRIES (SPCI)
• Detail Engineering of Sand Collection Package at Angsi Platform.
Client: PETRONAS CARIGALI SDN BHD

Piping Draftsman

Ranhill Worleyparsons Sdn. Bhd. (Kuala Lumpur)

April 2011 - December 2011

Scope of work:
• Produce and incorporate piping drawing Piping Plan (GA), Pipe Support Location Plan (PSL), Piping Layout Plan, Special Pipe Support Detail (SPS) and Pipe Support Details (PSD).
• Prepared piping indexes, plan elevations and post IFC changes.
• Update equipment layout and escape route.
• Helping modelling pipe support for plans and details using MDS application.
• Preparing Drawing Index, Pipe Support Standard (PSS) and Tie-in Schedule.
• Produced HVAC and Safety Layout.
• Piping design for steam tracing and manifolds layout.
• Assist designer in incorporating mark-ups to make sure that all drawings are ac-complished with the company standard design and practice.
Projects Involved:
• B-193 Process Platform Project.
Client: OIL & NATURAL GAS CORPORATION LTD, INDIA (ONGC)
• Bien Dong 1 Project Detail Design.
Client: PETROVIETNAM EXPLORATION PRODUCTION CORPORATION
• Shell Hijau Gasoil Project (EPC Phase).
Client: SHELL REFINING CO. (FEDERATION of MALAYA) BHD.
• Tapis EOR and Rejuvenation project GREENFIELD detail design.
• TAPIS ‘R’ & TAPIS ‘Q’ Platform.
Client: EXXONMOBIL EXPLORATION & PRODUCTION (M), Inc.

Mechanical / Piping Draftsman

Perunding Ranhill Worley Sdn. Bhd. (Kuantan)

December 2010 - April 2011

Scope of work:
• Responsible for design checking/drafting and preparation of detailed package.
• Prepared Piping Plan (G.A), Pipe Support Location Plan (PSL), Piping and Instrument Diagram (P&ID), Piping Isometric, Pipe Support Details (PSD), Special Pipe Support Detail (SPS) as per field changes and engineering revision.
• Preparing drawing Index.
• Piping design for steam tracing and manifolds layout.
• Assist designer in incorporating mark-ups to make sure that all drawings are ac-complished with the company standard design and practice.
Projects Involved:
• MMSB N2 Header & Piping.
• KVDT Bio-Diesel Facilities Project.
• SRC PD-LOBP Capacity Expansion Project (PD-120).
• STMSB Biodiesel Facility at Port Dickson.
Client: SHELL BHD.
• Revamp of Document Management System at MTBE.
• Revamp of Document Management System at PDH.
• New air compressor at Port Storage.
Client: MTBE SDN. BHD.

Piping Draftsman

Sime Darby Engineering Sdn. Bhd. (Pasir Gudang)

September 2008 - December 2010

Scope of work:
• Prepared Piping Plan (G.A), Pipe Support Location Plan (PSL), Piping and Instrument Diagram (P&ID), Piping Isometric, Pipe Support Details (PSD), Special Pipe Support Detail (SPS) as per field changes and engineering revision.
• Prepared engineering drawing as per client specification and applicable standards for the construction.
• To prepared fabrication shop drawing and prepared As-built drawings.
• Prepared Purchase Requisition (PR) in System Application Project (SAP).
• Prepared and issued Internal Discipline Check Transmittal Record (IDC) documents.
• Control incoming/outgoing drawing and prepared to Issued for Approval (IFA) and Issued for Construction (IFC).
• Assist designer in incorporating mark-ups to make sure that all drawings are ac-complished with the company standard design and practice.
• Update status in LIVELINK project. Update IDC & VDI tracking and filling drawing.
Projects Involved:
• Procurement and Construction (PC) of KAKG-A topsides, F9JT-A topside & KUJT-A topside for KUMANG CLUSTER DEVELOPMENT project (PHASE 1).
• Procurement and Construction (PC) of MELOR (MLDP-A) & LAHO (LHDP-A) drilling platform for TANGGA BARAT CLUSTER DEVELOPMENT project.
• Procurement and Construction (PC) of Qatar Petroleum topside.
• Procurement And Construction (PC) of MOQ-16 Topsides.
Client: PETRONAS CARIGALI SDN. BHD.

Staff LPG Officer

Mackt Oil & Gas Sdn. Bhd. (Shell)

August 2007 - September 2008

Scope of work:
• Prepared process LPG plant and management control of incoming and outgoing prod-uct.
• Control workers in company and be sure to follow the rules in the workplace.
• Ensure the quantity and quality of the products according to the standards.
• Ensure a safe workplace and machine in good condition.
Projects Involved:
• LPG Plant.
Client: SHELL SDN. BHD.

Trainee (Assistant Technician)

SAJ Holdings Sdn. Bhd. (Agency Muar), Johor.

July 2006 - December 2006

Scope of work:
• The development and design of new piping system and water supply for each project.
• Prepared new design for internal plumbing.
• Checking of pipe system and load testing at site.
• Analysis of reticulation system and checking of internal plumbing.
• Ensure that the work on construction sites running smoothly and make sure the work according to the guidelines set.
• Supervise the work on the construction site to follow as proposed and on schedule.

Qualifications & Certifications

Civil Engineering

Polytechnic Port Dickson, Malaysia

S.M. Teknik Kluang, Johor.

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Are you sure that you want to leave?

   
Supported Countries
Choose your country

×