K Balasubramanian - Dgm Civil Projects - Chikka Tirupathi, Karnataka 563160, India

K Balasubramanian K Balasubramanian

Chikka Tirupathi, Karnataka 563160, India

Services

Dgm Civil Projects

Summary:

i have experienced in high rise building.roads.bridges.dams and industrial structure etc.total years of experience nearly 28 years.

Work History

Senior Project Manager

Bus Depot

From March 2013

Senior Manager

Thiru Arooran Sugars LTD

September 2011 - February 2013

(1 ½ Years)

M/s URC Construction (P) Ltd

October 2009 - August 2011

Project Engineer

MEC & ECCI

March 2004 - September 2009

From 04.02.97 to 22.02.04 ( 7 years)

JP Bela Cements LTd

From February 2000

Crore
4. Midas Golden Distilleries at Padappai near Kanjeepuram-EstCost Rs.25 .00 Crores (MEC)

V. DETALILS OF THE EXPERIENCE IN I.T.PARK BUILDINGS:
1. Surya Park 3rd & 4th at Electronic city Bangalore Est Cost Rs. 15.00 Crores
2. HP phase Ist at electronic city DLP work Est cost Rs. 10.00 Lacks (JMC)
3. Salarpuria Symphony at Bellandur Bangalore DLP work Est Cost RS.5.00 Lacks(JMC)
4. HCL Phase !st at Electronic City DLP work Est Cost Rs. 10.00 Lacks (JMC)


VI. DETAILS OF THE EXPERIENCE IN RESIDENTIAL BUILDINGS:
1. Gopalan Enterprises "jewels" G+8 Floors at Kanakapura Main Road, Bangalor Flats 265 Nos Est Cost -Rs.20.00 Crores.
2. Gopalan Enterprises "Temple Trees" G+8 Floors at Kanakapura Main Road, Bangalore Flats 184 Nos Est Cost -20.00 Crores.
3. Sterling Developers "Sterling Shalom" Project at Brook Field Bangalore (A&B Block) G +8 //floors Flats 184 Nos Est Cost -20.00 Crores (JMC).


VII. DETAILS OF THE PROJECTS HANDLING IN PRESENT COMPANY
➢ Layout Development work at Anekal about 60 acress area, and construction of individual villas. Each villas nearly 1.50 crores, total estimate cost Rs. 30.00 crores.
➢ Apartment work (Malty Storied) at Anekal to Attibele Road, Ground floor + 9th floor and five towers nearly 20.00 lacks sq feet and infrastructure work. Total estimate cost Rs. 100 crores.
➢ Hotel In Land projects at Jigani, Ground floor + 5th floor nearly 2.00 lakhs sq feet. Estimate cost Rs. 20.00 crores.

Previous company: (M/S. URC Construction Pvt Ltd., Erode.)

1. M/S Muthayammal Engg. College & Polytechnic Institution at Namakkal Main Building, workshop, Ladies Hostel and Canteen Block Nearily 2.00 Lacks sft. (Est. cost Rs.25.00 Crores). (URC)

2. M/s Madras cements Ltd Virudunagar 2x50 MWA Power Plant and Matriculation School Building (Est. Cost Rs.20.00 Crore). (URC)

C Block and Guest House Building Nearly

From January 2000

lacks sft (Est. Cost Rs.15.00 Crore). (URC)

4. M/s Krishna Educational Trust College of Agriculture Near 2.00 lacks
Sft (Est.cost /Rs.25.00 Crore) (URC)

5. Railway Project from Mayiladurai To Thiruvarur 40.00 kilo miter. Mejor Bridges, miner Bridges and Gravel formation with side pitching work. Total estimate cost Rs. 50.00 crores.
POSITION HELD & NOS.OF YEARS WORKED

Senior Engineer

Ecc ltd

March 1992 - January 1997

Civil Supervisor

Thiru Arooran Sugars Ltd Tamil

September 1987 - February 1992

(4 ½ Years)

Asst Engineer

September 1984 - September 1987

(3 Years)

Senior Project Manager

R T Nagar, Opp of Bus Depot

Present

1.DETAILS OF THE EXPERIENCE IN INFRASTRUCTURE:

1. Pennar River Bridge at Tadapathri (AP State) 2.00 Km Length x 11 Mtr Wide (Estimate cost Rs. 8.00 Crores)

2. Modi under pass at Rajaji Nagar Bangalore Both Km length (Estimate Cost Rs. 14.00 Crores)

3. NHAI Road work at old madras Bellary road 11 km Length X11 Mtr Wide (Estimate Cost Rs. 11.00 Crores)

4. MADIWALS Bridge road work at Bangalore. Both Km Length & Main Drainage retaining work nearly 4 Km (Estimate Cost Rs. 6.00 Crores)

NOTE:ALL ARE CONSTRUCTED UNDER M/S ECCI LTD CHENNAI

1.DETAILS OF THE EXPERIENCE IN DAMS:

1. Kottai karunkulam Thirunelveli District Earth dam and irrigation RCC canal works in both side. Estimate cost Rs 20.00 crore (ECCI)

2. Sothuparai Masonry dam tunneling work. Estimate Cost Rs 30.00 Crores (ECCI).


III.DETAILS OF THE EXPERIENCE IN REFINERIES OIL AND GAS:
1. Sakthi fuel petrol bunk at salem vision 2000 modernization work (Estimate Cost Rs 1.00crore).
2. Sangagiri petrol bunk, fuel filing station and road work (Estimate cost 10.00 Crores).
3. Indian Oil Corporation Limited Gas Bottling Plant at Pollachi near Coimbatore (Estimate Cost Rs 8.00 Crores).
4. Madras Refineries limited at nagapattinam Fire water pump house, Reservoir & housing complex (Estimate Cost Rs 3.00 Crores).

NOTE: Above the works are constructed under M/s MYDHILY Engineering
Consultancy CHENNAI.

IV. DETAILS OF THE EXPERIENCE IN FACTORIES:
1. Thiru Arooran Sugars limited Vadapatimangalam Thiruvarur - Est Cost Rs. 15.00 Crores
2. Thirumandan Gudi New Sugar Factory at Kumbagonam - Est Cost Rs. 20.00 Crores

Qualifications & Certifications

Skillpages has been acquired by Bark.com!

Bark.com is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more


Are you sure that you want to leave?

   
Supported Countries
Choose your country

×