Eleven (11) years of Professional Experience: more than four years in Rail (Metro) Industry from Construction Stage up to Operation and Maintenance, started as a Communications Supervisor, then become a System Maintenance Supervisor, and currently acting as Rolling stock and Depot Equipment maintenance supervisor, as additional responsibilities I am doing also Defects and Liabilities on project snag list on communication systems, one year experience in Construction firm as an Electrical inspector (QA/QC roles) consultant company of design and construction project; and more than 5 years’ experience in a Semiconductor Company exposed in an ISO Standard working environment As Burn-in Supervisor and Process engineer.

- Proficient knowledge in Rail System Engineering and Operation Control System
- Testing and Commissioning and Integration of Rail Communications Systems and SCADA Systems
- IAS, FPS, ECS, TVS, PDS, Communication Systems and Rolling stock/Depot equipment
-Strong background on Communication, Electronics, Electrical, Semiconductor and Industrial and test services, including process capabilities, studies, establishing testing limits and parameters using engineering tools (7QC tools, 8D Method, PFMEA and SPC);


Electronics and Communication Engineer with the Experience in the Installation,Testing Commissioning

Work History

System Maintenance Supervisor


From May 2009

specialized in
Signaling & Communication Systems
Installation and Testing & Commissioning Department
Dubai Metro Railways Project Office
P.O. Box 183357
Dubai; U.A.E.

Testing/Commissioning Supervisor

Communication and Signaling

From July 2009

• Supervised and Inspect Communication Equipments installation and wiring condition base on approved design drawings and specification in compliance of company standards and Government codes Communication systems like Public Announcement system, Public Information system, CCTV, Narrow band radio, Broadband radio, Video Broadcasting system and Operation Control System;
• Testing and commissioning in On board system, Ground communication systems; Fire alarm system; Voice evacuation system; SCADA or Operation control system, System integration test, End to End Test and Stand alone test;
• Perform Software uploading and configuration base on the latest version requirements;
• Studies, formulates and recommends improvements or changes necessary for an effective and efficient testing and operation;
• Support Sub-contractor testing and Commissioning such as MSN, IAS, FPS, ECS, TVS, TDS and PDS LV test.

Additional Skills and Knowledge during Testing and Commissioning;

Train Controller
• Supervise, give instruction and support the subordinates with regards to the operating condition / situation, then decides on the implementation of corresponding standard operating, intervention, breakdown and emergency procedures;
• Studies, formulates and recommends improvements or changes necessary for an effective and efficient testing and operation;
• Monitors, operates and give command to SMC terminal and VCC-CCOT such as VCC start up commands, VCC track commands, Train commands, VCC Switch commands, VCC Output commands and VCC station commands;
• Support sub-contractor Testing such as Signaling, PSD Interface Test and Investigation, VCC Test, Data Com Test; Guide way Test and OCS Comms Interface Test.

Train Driver/Operator with certification (30Kph/90KPH)

• Trained and certified Train operator during Testing and commissioning process.

Project Consultant of Construction design/installation


May 2008 - May 2009

Jumeirah Park Villas and Apartments
Dubai; U.A.E.

• Supervised and evaluates Drawings, Design and Materials submitted by Contractors;
• Inspect and Check the Installation, Condition and Quality of work standards made by contractors in the site;
• Verify and Validates Electrical Peripherals and accessories presented by Contractors base on the design requirements and specification;
• Audit and Perform Quality Control on the installation Condition of Electrical equipments such as wires, Switches, lightings and Other related instrument installed in a certain area;
• Sign and Approve Inspection request after thorough quality inspections;
• Issuing a NCR (No conformance report) any negligence in compliance of requirements & specification as per on the approved design and method statements;

Manufacturing supervisor/{rocess engineer

Texas Instrument Philippines

November 2003 - May 2008

Baguio City Philippines

• Three (5) years of working experience in International Semiconductor Company;
• Supervises manpower allocation and daily attendances;
• Administer line consistency as to provide applicable and relevant reports needed for productivity monitoring and BIB Management;
• Creates reports base on current issues;
• Performs failure and mode analysis;
• Develops and improves procedural basis on production line;
• Performs research and experiments on continuous improvements;
• Provides trainings for skills development and career growth;
• Implements immediate preventive action on control limits;
• Analyze and establish preventive actions of BIB failures and socket failures;
• Create effective and useful procedures based on the findings established to provide containment, corrective and preventive actions;
• Manages material inventory including Bib's, component spares, socket spares, repair tools, and other tangible materials;



From August 2001

• Supervised and Maintained All major systems and subsystems of ATC Signaling; Telecommunication system (CCTV Camera, Video Broadcasting System, PIS/PAS, Intrusion Alarm system, Telephone TN-ECB, BBR-Broadband Radio system, MSN(Multiservice Network); SCADA(OCS); PSD(Platform Screen Door); PDS (Power Distribution System Low Voltage); AFC (Automatic Fare Collection); Fire alarm system; Voice evacuation system and Other Subsystem connected to Dubai Metro operation;
• Supervises, coordinate and performed all activities for corrective and preventive maintenance of Dubai Metro Rail System including the Work Permit and Risk Assessment as well as Methodology of Statement.
• Conducts investigation, rectification, troubleshooting during emergency breakdown of the captioned subsystems in compliance of the operator procedures.
• Responsible for preventive maintenance of UPS (Uninterruptable power supply) that supply the vital sub-systems in Dubai Metro Railway systems such as COMMUNICATION, SIGNALLING, AFC and PSD).
• It includes Software checking; deployment of Software updates and configurations accordingly.

Additional Skills and knowledge as Flexible Supervisor (Maintenance Team);

Rolling stock and Depot Equipment Maintenance

• Supervised and maintained all major concerns whether mechanical and electrical issue's which train fits for operation.
• Perform Corrective and Preventive Maintenance to preserve and sustain Good condition of all trains to be use in Operation.
• Assess and check according to reported problem to be carried out like on Mechanicals; Electricals; hydraulics and other parts of train as well as Wheel reprofilling and Maintenance of Depot equipment

DLP Communication system Snag List rectification and investigation Team

• Responsible in DLP Snag list for communication systems such BBR (Broadband radio), NBR (Narrow Band radio), AP Box investigation and Bandwidth measurements, Signal to Noise Measurement, investigation and installation of UDC (Up down...

Qualifications & Certifications

Electronics & Communication Engineering

University of Baguio

University of Baguio

Skillpages has been acquired by! is pioneering the way people find local services. Skillpages is the world’s premier directory of service providers.

Find out more

Supported Countries
Choose your country