was friendly honest and work was spot on

3 August 2016

The team at Mr-DIY came in to complete a full renovation with a service-focused and hard working attitude. Managed to complete assigned work efficiently within an established time frame in order to meet project objectives.

Reviewed on Facebook

28 May 2014

Mr DIY was a trustworthy helpful solution at an affordable price I would recommend the service to anyone looking for a reliable service at an affordable cost.

Reviewed on Google Maps

Q&As

The features that will decide the suitability of the roof space for a loft conversion are the available head height, the pitch and the type of structure, as well as any obstacles such as water tanks or chimney stacks. An inspection of the roof space will reveal its structure and physical dimensions

Works will commence with the erection of independent scaffolding.
First delivery of materials – ie structural steels, joisting timbers etc.
An opening is made in the roof for access – initial works are completed externally, so minimising internal disturbance (approx 3/4 weeks)
Floor joisting carried out – following which the local authority Building Inspector will visit to approve floor construction.
If a dormer conversion, the dormer will next be constructed, insulation installed, followed by a further inspection by the Building Inspector.
Completion of external works – ie roofing of dormer, lead work, fascias, soffits, guttering.
Internally, erecting studwork walls, forming bedrooms/ensuite/stairwell access. Insulating walls to required standard.
Fitting dormer windows/Velux windows.
Creating access to facilitate installation of new staircase and fitting new stairs.
Installing new cabling for lighting, sockets, Expelair, smoke alarms etc.
First fix plumbing to new ensuite and additional radiator(s).
Plastering all new areas.
Second fix carpentry works – ie skirtings, architraves, doors, handrail, spindles etc.
Second fix works for electrics (upvc fittings installed) and plumbing (sanitary ware, radiators etc).
Clearing down – including guttering inspection.
Final inspection by Building Inspector who issues Completion Certificate (all works having complied with building and fire regulations).
The new loft is now ready for decoration and habitation.